Skip to content
ViolationScout19 certifications filed against 4 new Class C in the last 180 days.Is this your building?
Buildings65 Ft Washington Avenue, ManhattanCurrent through

65 Ft Washington Ave, Manhattan

BBL 1-02136-0145

En español: 76 violaciones de Clase C abiertas (peligro inmediato) y 284 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 1 de octubre de 2019.

Certifications are being filed faster than new violations come in. 19 certifications filed against 4 new Class C in the last 180 days.

The oldest open HPD violation has been open 6 years, since October 1, 2019.

Since September 29, 2023, certifications were filed on 92 Class C violations, all 92 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works

Is this your building?

76 open Class C and 4 OATH hearings starting November 12, 2026. The oldest open HPD violation was filed October 1, 2019.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

HPD vacate order
HPD's vacate order for part of the building has been in effect since August 30, 2022. Reason on the order: illegal occupancy.
OATH hearings
4 hearings scheduled on DOB summonses, the first on November 12, 2026.
DOB violations
3 active DOB violations. The newest was issued May 29, 2026.
Housing court
2 open housing court cases. The newest opened September 2, 2025.
DOB complaints
34 DOB complaints, 11 of them conversion complaints, in the 12 months to September 25, 2026. The newest was filed September 22, 2026.
DOB permits
3 DOB work permits in effect. The latest, for General Construction work, was issued May 13, 2026.
Energy benchmarking
ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected June 5, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 31, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened August 27, 2024, awarded for $687.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C76 open most often Vermin / Infestation
Notice sent1920825865 FW OWNER LLC
Fire SafetyNo access to reinspect (first try)1917735565 FW OWNER LLC
CIV14 mailed1907561365 FW OWNER LLC
Vermin / InfestationTo be reinspected19054612
Heat / Hot WaterNotice sent18551440
Notice sent18551436
Notice sent18544599
Heat / Hot WaterNotice sent18527983
Notice sent18485080
Vermin / InfestationNotice sent to tenant18445021
The report lists all 76, each with the city's own words and the date on its notice. What the report adds
Class B201 open most often Fire Safety
Notice sent1920826165 FW OWNER LLC
Notice sent1920826065 FW OWNER LLC
Notice sent1920825965 FW OWNER LLC
CIV14 mailed1917735465 FW OWNER LLC
CIV14 mailed1912522065 FW OWNER LLC
CIV14 mailed1912521765 FW OWNER LLC
CIV14 mailed1907561265 FW OWNER LLC
CIV14 mailed1907561165 FW OWNER LLC
CIV14 mailed1907561065 FW OWNER LLC
Certified on time19026693
The report lists all 201, each with the city's own words and the date on its notice. What the report adds
OATH/ECB7 open most often Construction
Construction, Class 2Hearing pending39205084Z65 FW OWNER LLC
Construction, Class 2Hearing pending39205083R65 FW OWNER LLC
Construction, Class 2Hearing pending39197190P65 FW OWNER LLC
Construction, Class 2Hearing pending39197189H65 FW OWNER LLC
Elevators, Class 2Found in violation39153573H
Construction, Class 2Found in violation39150139L
Construction, Class 2Found in violation39119056K

The full report on 65 Ft Washington Ave, Manhattan

Get the report on 65 Ft Washington Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block (12 of 18)

Nearby buildings

Questions about this building

Does 65 Ft Washington Avenue, Manhattan have open violations?

Yes. 65 Ft Washington Avenue, Manhattan had 284 open violations on September 27, 2026: 7 from OATH/ECB and 277 from HPD. 76 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 6 years, since October 1, 2019.

Is 65 Ft Washington Avenue, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 19 certifications filed against 4 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 65 Ft Washington Avenue, Manhattan?

Since September 29, 2023, certifications were filed on 92 Class C violations, all 92 by the original certify-by date. HPD now marks 1 of them Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is an HPD vacate order in effect at 65 Ft Washington Avenue, Manhattan?

Yes. HPD's vacate order for part of the building has been in effect since August 30, 2022. Reason on the order: illegal occupancy. A vacate order requires all or part of a building to be emptied for the reason on the order, and it stays in effect until HPD rescinds it. HPD Online shows whether an order has been rescinded since.

Does 65 Ft Washington Avenue, Manhattan have an OATH hearing coming up?

Yes. 4 hearings scheduled on DOB summonses, the first on November 12, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 65 Ft Washington Avenue, Manhattan have active DOB violations?

Yes. 3 active DOB violations. The newest was issued May 29, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 65 Ft Washington Avenue, Manhattan in housing court?

Yes. 2 open housing court cases. The newest opened September 2, 2025. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 65 Ft Washington Avenue, Manhattan?

Yes. 34 DOB complaints, 11 of them conversion complaints, in the 12 months to September 25, 2026. The newest was filed September 22, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 65 Ft Washington Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened August 27, 2024, awarded for $687. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Are any DOB work permits in effect at 65 Ft Washington Avenue, Manhattan?

Yes. 3 DOB work permits in effect. The latest, for General Construction work, was issued May 13, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 65 Ft Washington Avenue, Manhattan?

ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 65 Ft Washington Avenue, Manhattan last inspected?

On June 5, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 65 Ft Washington Avenue, Manhattan last file its bedbug report?

On December 31, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 65 Ft Washington Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 65 Ft Washington Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 65 Ft Washington Avenue, Manhattan built?

The city's record gives 1920 as the year 65 Ft Washington Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 65 Ft Washington Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 41 residential units at 65 Ft Washington Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD vacate orders, OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD vacate orders, OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 65 Ft Washington Ave, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/65-ft-washington-avenue-manhattan

How we count: /method.

Is this your building?