974 St Nicholas Ave, Manhattan
- Built 1910
- 6 floors
- 17 residential units
- Elevator apartment building
En español: 19 violaciones de Clase C abiertas (peligro inmediato) y 42 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 16 de marzo de 2021.
Open violations are sitting, with little movement either way. 19 open Class C, with 3 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
The oldest open HPD violation has been open 5 years, since March 16, 2021.
Since September 29, 2023, certifications were filed on 47 Class C violations: 46 by the original certify-by date, 1 after it. HPD now marks 1 of them False Certification. How certification works
- OATH hearings
- A hearing on a DOB summons is set for March 25, 2027.
- DOB violations
- 3 active DOB violations, most of them for construction. The newest was issued April 13, 2016.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed December 16, 2025.
- Certificate of occupancy
- Final, issued September 14, 2015.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected January 14, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed March 19, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since September 29, 2023, awarded for $4,799 in total. The most recent of the 3, a general construction order, was opened January 4, 2024.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 19 open most often Heat / Hot Water | ||
| Lead Paint | Notice sent | 19019550 | |
| Lead Paint | Notice sent | 19019549 | |
| Invalid certification | 18711967 | ||
| Heat / Hot Water | Invalid certification | 18711966 | |
| Heat / Hot Water | Invalid certification | 18711964 | |
| Heat / Hot Water | Notice sent | 17223852 | |
| Certified late | 17025852 | ||
| Not complied with | 16941098 | ||
| Vermin / Infestation | False certification | 16941097 | |
| Lead Paint | Notice sent | 16978005 | |
| The report lists all 19, each with the city's own words and the date on its notice. What the report adds | |||
| Class B | 22 open most often Lead Paint | ||
| Lead Paint | Notice sent | 19056327 | |
| Lead Paint | Notice sent | 19056326 | |
| Lead Paint | Notice sent | 19056325 | |
| Lead Paint | Notice sent | 19056324 | |
| Lead Paint | Notice sent | 19056323 | |
| Lead Paint | Notice sent | 19056322 | |
| Lead Paint | Notice sent | 19040607 | |
| Lead Paint | Notice sent | 19040606 | |
| Lead Paint | Notice sent | 19040605 | |
| Lead Paint | Notice sent | 19040602 | |
| The report lists all 22, each with the city's own words and the date on its notice. What the report adds | |||
| OATH/ECB | 1 open | ||
| Construction, Class 2 | Hearing pending | 39170676P | |
The full report on 974 St Nicholas Ave, Manhattan
- All 42 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 1 OATH/ECB summons with its hearing date and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 974 St Nicholas Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.