799 8th Ave, Manhattan
- Built 1910
- 8 floors
- 107 residential units
- Elevator apartment building
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total. La más antigua del HPD lleva 37 años abierta, desde el 5 de julio de 1989.
Certifications are being filed faster than new violations come in. 9 certifications filed against 3 new Class C in the last 180 days.
The oldest open HPD violation has been open 37 years, since July 5, 1989.
Since September 29, 2023, certifications were filed on 8 Class C violations: 7 by the original certify-by date, 1 after it. How certification works
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on October 22, 2026.
- DOB violations
- 1 active DOB violation, issued May 31, 2018.
- Housing court
- 1 open housing court case, opened August 3, 2026.
- DOB complaints
- 11 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 22, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed December 14, 2020 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 2 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 9, 2026.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected July 1, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened August 19, 2025, awarded for $295.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Lead Paint | |||
| Lead Paint | Defect letter sent | 19004455 | 300 WEST 49TH ST LLC | |
| Fire Safety | Notice sent | 18997984 | 300 WEST 49TH ST LLC | |
| Fire Safety | Notice sent | 18982684 | 300 WEST 49TH ST LLC | |
| Lead Paint | Notice sent | 18584860 | 300 WEST 49TH ST LLC | |
| Lead Paint | Defect letter sent | 18584841 | 300 WEST 49TH ST LLC | |
| Lead Paint | Defect letter sent | 18584839 | 300 WEST 49TH ST LLC | |
| Lead Paint | To be reinspected | 18584838 | 300 WEST 49TH ST LLC | |
| Heat / Hot Water | Not complied with | 17779989 | ||
| Heat / Hot Water | Not complied with | 17617384 | ||
| Fire Safety | Not complied with | 16718396 | ||
| Class B | 7 open most often Fire Safety | |||
| Fire Safety | CIV14 mailed | 18997995 | 300 WEST 49TH ST LLC | |
| Fire Safety | CIV14 mailed | 18997989 | 300 WEST 49TH ST LLC | |
| Fire Safety | CIV14 mailed | 18997969 | 300 WEST 49TH ST LLC | |
| Fire Safety | CIV14 mailed | 18997968 | 300 WEST 49TH ST LLC | |
| Fire Safety | Not complied with | 16718399 | ||
| Fire Safety | Not complied with | 16718398 | ||
| Not complied with | 16718395 | |||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39559511M | ||
| Construction, Class 2 | Hearing pending | 39557958J | 300 WEST 49TH ST LLC | |
| Construction, Class 2 | Decided by default | 39552176M | 300 WEST 49TH ST LLC | |
The full report on 799 8th Ave, Manhattan
- All 20 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 3 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 799 8th Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.