Skip to content
ViolationScout46 certifications filed against 19 new Class C in the last 180 days.Your building
Buildings1781 Clay Avenue, BronxCurrent through

1781 Clay Ave

Mount Hope, Bronx, NY 10457

1781 Clay Avenue is a walk-up building with 43 apartments, built in 1925. It has 73 open violations, 25 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 4, 2019.

En español: 25 violaciones de Clase C abiertas (peligro inmediato) y 73 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 4 de noviembre de 2019.

Open now, most hazardous first

  1. 25

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    27 open counting every year, the oldest since

    Get these certified
  2. 44

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 44
  3. 4

    OATH/ECB summonses still active. Most often Construction.

    See the 4

5.8 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 46 certifications filed against 19 new Class C in the last 180 days.

Since November 27, 2023, certifications were filed on 64 Class C violations, all 64 by the original certify-by date. HPD now marks 2 of them Invalid Certification. How certification works

The original certify-by dates on the 69 open HPD violations run from February 13, 2024 to December 25, 2026.

Zoning district
R7-1
Lot area
7,505 sq ft
Floor area
38,000 sq ft
Tax lot (BBL)
2-02799-0030

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C25 open most often Lead Paint
Notice sent19354377
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door (from courtyard to public hall) , 2nd story
CIV14 mailed19272726
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north
Notice sent19272389
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north
Lead PaintNotice sent19266907
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the kitchen
Lead PaintNotice sent19266905
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st window frame from east at south wall in the 1st room from east at south
Notice sent19258426
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment
Fire SafetyNotice sent19258425
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective due to unaligned door in the entrance
Vermin / InfestationNotice sent to tenant19258423
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNotice sent to tenant19258422
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Notice sent19242663
§ 27-2005, 2007 ADM CODE Remove the illegal fastening consisting of an unacceptable two motion electromagnetic locking device installed at building entrance door , 2nd story
Certified on time19185944
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of discarded refrigerator with doors attached at south wall at basement (rear yard) at public hall
Certified on time19185942
§ 27-2005, 2007 ADM CODE Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at street door at public hall, 1st story
Certified on time19185936
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of wood slab obstructing downward motion to drop ladder at 1st fire escape from east at north exterior wall
CIV14 mailed19185931
§ 27-2005, 2007 ADM CODE Remove the illegal fastening lockable slide bolt installed at door in the entrance
CIV14 mailed19185922
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective cracked ceramic tiles at floor approximately 4SQFT in the 4th room from east
CIV14 mailed19185921
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective sagging wood subfloor underneath the floor in the 4th room from east
Fire SafetyNotice sent19093558274 E 175 REALTY LLC
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinge in the entrance
Invalid certification19062034274 E 175 REALTY LLC
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of plexi glass installed at vestibule door , 1st story
Invalid certification19062025274 E 175 REALTY LLC
§ 27-2005 HMC: Properly repair or replace the broken or defective counter balance lower sash fire escape window
Not complied with18738996274 E 175 REALTY LLC
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of plexglass ( 5 lites) installed at door [ vestibule to public hall] that is creating a fire hazard , 1st story
Fire SafetyTo be reinspected18662559274 E 175 REALTY LLC
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set and assemblies at building entrance door ( from court to public hall) at public hall, 1st story
Lead PaintNotice sent18252273274 E 175 REALTY LLC
§ 27-2056.4 ADM CODE- correct failure to notify occupants and/or to investigate lead-based paint hazards.
Lead PaintNotice sent18252272274 E 175 REALTY LLC
§ 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Lead PaintNotice sent17520981
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent16596517
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
In HPD's words. Apartment numbers are left out.
Class B44 open most often Mold
Notice sent19354378
CIV14 mailed19272728
CIV14 mailed19272727
Notice sent19272391
Notice sent19272390
Notice sent19258424
Notice sent19247630
Notice sent19242674
Notice sent19242671
Notice sent19185943
Notice sent19185941
Notice sent19185940
Notice sent19185939
Notice sent19185938
Notice sent19185933
Notice sent19185932
Fire SafetyCIV14 mailed19185930
Fire SafetyCIV14 mailed19185929
CIV14 mailed19185928
Heat / Hot WaterCIV14 mailed19185927
Heat / Hot WaterCIV14 mailed19185926
CIV14 mailed19185925
CIV14 mailed19185924
MoldInvalid certification19185923
CIV14 mailed19185920
MoldInvalid certification19185919
Notice sent19047260274 E 175 REALTY LLC
Notice sent19047259274 E 175 REALTY LLC
Not complied with18997235274 E 175 REALTY LLC
Not complied with18781649274 E 175 REALTY LLC
MoldDefect letter sent18781648274 E 175 REALTY LLC
MoldDefect letter sent18781646274 E 175 REALTY LLC
MoldDefect letter sent18781642274 E 175 REALTY LLC
MoldDefect letter sent18781641274 E 175 REALTY LLC
MoldDefect letter sent18781638274 E 175 REALTY LLC
Not complied with18738999274 E 175 REALTY LLC
MoldNo access to reinspect (first try)18975044274 E 175 REALTY LLC
Lead PaintNotice sent18359486274 E 175 REALTY LLC
Lead PaintNotice sent18259368274 E 175 REALTY LLC
Lead PaintNotice sent18259365274 E 175 REALTY LLC
Lead PaintNotice sent18259360274 E 175 REALTY LLC
Lead PaintNotice sent18259352274 E 175 REALTY LLC
Lead PaintNotice sent18259347274 E 175 REALTY LLC
Lead PaintNotice sent18259326274 E 175 REALTY LLC
OATH/ECB4 open most often Construction
Construction, Class 1Hearing pending39206699J
Construction, Class 1Found in violation35718640Z274 E 175 REALTY LLC
Construction, Class 1Found in violation35733202Y274 E 175 REALTY LLC
Construction, Class 1Hearing pending35718869R274 E 175 REALTY LLC
Is this your building?Also for tenants and buyers
Is this your building?

2 OATH hearings starting December 29, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
18 on September 24, 2026 and 26 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 995 violations and closed 925, all classes.
YearFiledClosed
2026172159
2025138204
202420998
20236256
20222131
20218169
202086154
20197562
201813680
20171512
Energy benchmarking
ENERGY STAR score 40 for 2025, against a median of 69 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed March 27, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair orders
2 completed HPD emergency repair orders since November 27, 2023, awarded for $3,200 in total. The most recent of the 2, a general construction order, was opened September 22, 2025. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH hearings
2 hearings scheduled on DOB summonses, the first on December 29, 2026.
OATH/ECB summonses
4 DOB summonses here since January 1, 2019, with $8,750 in penalties imposed. All 4 are still active, the same 4 listed under OATH/ECB.
  • October 5, 2026, DOB: Work without a permit. $2,500 penalty imposed.
  • May 29, 2026, DOB: Unlawful acts. Failure to comply with an order of the commissioner. In violation, $2,500 penalty imposed.
  • May 6, 2026, DOB: Miscellaneous violations. In violation, $1,250 penalty imposed.

The newest 3 of 4 summonses OATH lists here.

Housing court
15 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
11 active DOB violations. The newest was issued April 6, 2026.
DOB complaints
8 DOB complaints in the last 12 months. The newest was filed October 4, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
15 DOB complaints from 1993 through November 25, 2026. 14 DOB violations since 2006, 3 dismissed in DOB's records.
DOB permits
1 DOB work permit in effect, for General Construction work, issued July 28, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
Boiler inspection
Inspected December 23, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1781 Clay Ave have open violations?

Yes. It had 73 open violations on November 25, 2026: 69 from HPD and 4 from OATH/ECB. 25 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 7 years, since November 4, 2019.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 46 certifications filed against 19 new Class C in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 1781 Clay Ave, Bronx: 43 units, 25 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/1781-clay-avenue-bronx

How we count: /method.

Is this your building?