Skip to content
ViolationScout93 certifications filed and 56 new Class C in the last 180 days, neither far ahead.Is this your building?
Buildings974 Sheridan Avenue, BronxCurrent through

974 Sheridan Ave, Bronx

BBL 2-02455-0014

En español: 97 violaciones de Clase C abiertas (peligro inmediato) y 207 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 18 de mayo de 2018.

Certifications are being filed about as fast as new violations come in. 93 certifications filed and 56 new Class C in the last 180 days, neither far ahead.

The oldest open HPD violation has been open 8 years, since May 18, 2018.

Since September 29, 2023, certifications were filed on 86 Class C violations: 69 by the original certify-by date, 17 after it. How certification works

Is this your building?

97 open Class C and 3 OATH hearings starting October 16, 2026. The oldest open HPD violation was filed May 18, 2018.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

HPD vacate order
HPD's vacate order for part of the building has been in effect since January 8, 2025. Reason on the order: illegal occupancy.
OATH hearings
3 hearings scheduled on DOB summonses, the first on October 16, 2026.
DOB violations
8 active DOB violations, most of them for construction. The newest was issued December 11, 2024.
DOB complaints
5 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 10, 2026.
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued September 24, 2026.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected February 23, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 4, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
7 completed HPD emergency repair orders since September 29, 2023, awarded for $25,150 in total. The most recent of the 7, a general construction order, was opened May 20, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C97 open most often Lead Paint
Open19248979
Fire SafetyOpen19248978
Open19248977
Lead PaintNotice sent19234834
Lead PaintNotice sent19234833
Lead PaintNotice sent19234832
Lead PaintNotice sent19234831
Lead PaintNotice sent19234829
Lead PaintNotice sent19233572
Notice sent19213884
The report lists all 97, each with the city's own words and the date on its notice. What the report adds
Class B102 open most often Fire Safety
Open19248980
Open19248975
Open19248973
Open19248972
Notice sent19228725
Notice sent19225386
Fire SafetyNotice sent19213886
Fire SafetyNotice sent19213885
Notice sent19213883
MoldNotice sent to tenant19213881
The report lists all 102, each with the city's own words and the date on its notice. What the report adds
OATH/ECB8 open most often Construction
Construction, Class 2Hearing pending39199295KNYC CAPITAL VALUE FUND II
Construction, Class 1Hearing pending35667969RNYC CAPITAL VALUE FUND II
Construction, Class 2Hearing pending39188658RNYC CAPITAL VALUE FUND II
Construction, Class 1Decided by default39135637Z
Construction, Class 1Decided by default35483903H
Elevators, Class 2Decided by default39120583K
Construction, Class 1Decided by default35685393M
Elevators, Class 1Decided by default39112323Y

The full report on 974 Sheridan Ave, Bronx

Get the report on 974 Sheridan Ave, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 974 Sheridan Avenue, Bronx have open violations?

Yes. 974 Sheridan Avenue, Bronx had 207 open violations on September 27, 2026: 199 from HPD and 8 from OATH/ECB. 97 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 8 years, since May 18, 2018.

Is 974 Sheridan Avenue, Bronx getting better or worse?

Certifications are being filed about as fast as new violations come in. 93 certifications filed and 56 new Class C in the last 180 days, neither far ahead. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 974 Sheridan Avenue, Bronx?

Since September 29, 2023, certifications were filed on 86 Class C violations: 69 by the original certify-by date, 17 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is an HPD vacate order in effect at 974 Sheridan Avenue, Bronx?

Yes. HPD's vacate order for part of the building has been in effect since January 8, 2025. Reason on the order: illegal occupancy. A vacate order requires all or part of a building to be emptied for the reason on the order, and it stays in effect until HPD rescinds it. HPD Online shows whether an order has been rescinded since.

Does 974 Sheridan Avenue, Bronx have an OATH hearing coming up?

Yes. 3 hearings scheduled on DOB summonses, the first on October 16, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 974 Sheridan Avenue, Bronx have active DOB violations?

Yes. 8 active DOB violations, most of them for construction. The newest was issued December 11, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 974 Sheridan Avenue, Bronx?

Yes. 5 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 10, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 974 Sheridan Avenue, Bronx marked completed?

Yes. 7 completed HPD emergency repair orders since September 29, 2023, awarded for $25,150 in total. The most recent of the 7, a general construction order, was opened May 20, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Are any DOB work permits in effect at 974 Sheridan Avenue, Bronx?

Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued September 24, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was the boiler at 974 Sheridan Avenue, Bronx last inspected?

On February 23, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 974 Sheridan Avenue, Bronx last file its bedbug report?

On December 4, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 974 Sheridan Avenue, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 974 Sheridan Avenue, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 974 Sheridan Avenue, Bronx built?

The city's record gives 1927 as the year 974 Sheridan Avenue, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 974 Sheridan Avenue, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 49 residential units at 974 Sheridan Avenue, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD vacate orders, OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD vacate orders, OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 974 Sheridan Ave, Bronx: 97 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/974-sheridan-avenue-bronx

How we count: /method.

Is this your building?