923 Simpson St, Bronx
- Built 1909
- 6 floors
- 43 residential units
- Elevator apartment building
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 53 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 4 de agosto de 2021.
Open violations are sitting, with little movement either way. 10 open Class C, with 1 certification filed and 4 new Class C in the last 180 days, too few to call a direction.
The oldest open HPD violation has been open 5 years, since August 4, 2021.
Since September 29, 2023, certifications were filed on 4 Class C violations: 2 by the original certify-by date, 2 after it. How certification works
- DOB violations
- 5 active DOB violations. The newest was issued November 14, 2025.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed December 27, 2025.
- DOB facade
- Rated SWARMP in the latest facade report, filed January 17, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 9, 2026.
- Energy benchmarking
- ENERGY STAR score 44 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected August 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed January 1, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- HPD emergency repair orders
- 4 completed HPD emergency repair orders since September 29, 2023, awarded for $1,665 in total. The most recent of the 4, a general construction order, was opened September 26, 2024.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Vermin / Infestation | |||
| Notice sent | 19084252 | PRC SIMPSON STREET LLC | ||
| Fire Safety | Notice sent | 19084251 | PRC SIMPSON STREET LLC | |
| Notice sent | 19084250 | PRC SIMPSON STREET LLC | ||
| Not complied with | 19005376 | PRC SIMPSON STREET LLC | ||
| Fire Safety | No access to reinspect (first try) | 18685940 | PRC SIMPSON STREET LLC | |
| Vermin / Infestation | Not complied with | 16314556 | ||
| Vermin / Infestation | Defect letter sent | 16314554 | ||
| Vermin / Infestation | Defect letter sent | 16313032 | ||
| Vermin / Infestation | Not complied with | 16313031 | ||
| Vermin / Infestation | No access to reinspect (first try) | 16299169 | ||
| Class B | 42 open most often Fire Safety | |||
| Fire Safety | Notice sent | 19144156 | PRC SIMPSON STREET LLC | |
| Fire Safety | Notice sent | 19144155 | PRC SIMPSON STREET LLC | |
| Notice sent | 19084249 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19084248 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19084247 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19021461 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19021460 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19021459 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19021458 | PRC SIMPSON STREET LLC | ||
| Notice sent | 19021457 | PRC SIMPSON STREET LLC | ||
| The report lists all 42, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 1 open | |||
| Elevators, Class 2 | Found in violation | 39169696Y | PRC SIMPSON STREET LLC | |
The full report on 923 Simpson St, Bronx
- All 53 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 1 OATH/ECB summons with its hearing date and any penalty imposed.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 923 Simpson St, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.