92 Nagle Ave, Manhattan
- Built 1927
- 6 floors
- 68 residential units
- Elevator apartment building
En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 51 abiertas en total. La más antigua del HPD lleva 30 años abierta, desde el 16 de febrero de 1996.
Certifications are being filed faster than new violations come in. 29 certifications filed against 6 new Class C in the last 180 days.
The oldest open HPD violation has been open 30 years, since February 16, 1996.
Since September 29, 2023, certifications were filed on 12 Class C violations, all 12 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since July 15, 2013. Reason on the order: habitability.
- DOB violations
- 35 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued December 13, 2023.
- Housing court
- 2 open housing court cases, most of them tenant actions. The newest opened July 8, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed February 21, 2022 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected December 30, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed February 19, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened May 5, 2025, awarded for $570.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 15 open most often Vermin / Infestation | |||
| Fire Safety | Notice sent | 19148464 | 92 98 LLC | |
| Vermin / Infestation | Notice sent to tenant | 19148456 | 92 98 LLC | |
| Vermin / Infestation | Notice sent to tenant | 19148455 | 92 98 LLC | |
| Fire Safety | Invalid certification | 18931542 | 92 98 LLC | |
| Vermin / Infestation | Not complied with | 18931532 | 92 98 LLC | |
| Mold | Notice sent to tenant | 18818008 | 92 98 LLC | |
| Vermin / Infestation | Notice sent | 18379278 | ||
| Heat / Hot Water | Notice sent | 18379277 | ||
| Heat / Hot Water | Notice sent | 18379274 | ||
| Fire Safety | Notice sent | 17850519 | ||
| The report lists all 15, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 35 open | |||
| Notice sent | 19193017 | |||
| Notice sent | 19193016 | |||
| Notice sent | 19148463 | 92 98 LLC | ||
| Notice sent | 19148462 | 92 98 LLC | ||
| Notice sent | 19148461 | 92 98 LLC | ||
| Notice sent | 19148460 | 92 98 LLC | ||
| Notice sent | 19148459 | 92 98 LLC | ||
| Notice sent | 19148458 | 92 98 LLC | ||
| Fire Safety | Notice sent | 19148457 | 92 98 LLC | |
| Fire Safety | Notice sent | 19148454 | 92 98 LLC | |
| The report lists all 35, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 1 open | |||
| Elevators, Class 2 | Decided by default | 39149064H | ||
The full report on 92 Nagle Ave, Manhattan
- All 51 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 1 OATH/ECB summons with its hearing date and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 92 Nagle Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.