Skip to content
ViolationScout114 certifications filed and 78 new Class C in the last 180 days, neither far ahead.Is this your building?
Buildings40 West Mosholu Parkway South, BronxCurrent through

40 West Mosholu Parkway South, Bronx

BBL 2-03251-0490

En español: 106 violaciones de Clase C abiertas (peligro inmediato) y 227 abiertas en total. La más antigua del HPD lleva 20 años abierta, desde el 18 de septiembre de 2006.

Certifications are being filed about as fast as new violations come in. 114 certifications filed and 78 new Class C in the last 180 days, neither far ahead.

The oldest open HPD violation has been open 20 years, since September 18, 2006.

Since September 29, 2023, certifications were filed on 121 Class C violations: 110 by the original certify-by date, 11 after it. HPD now marks 3 of them False Certification and 4 Invalid Certification. How certification works

Is this your building?

106 open Class C and a facade rated Unsafe. The oldest open HPD violation was filed September 18, 2006.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
13 active DOB violations, most of them for construction. The newest was issued July 24, 2026.
Housing court
1 open housing court case, opened May 16, 2025.
DOB complaints
23 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 28, 2026.
DOB facade
Rated Unsafe in the latest facade report, filed March 3, 2025 (inspection cycle 10). Need this filed?
DOB permits
5 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued September 22, 2026.
Local Law 97
Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026).
Boiler inspection
3 boilers, all inspected in 2026, the latest on August 19. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed for its 2 buildings by December 16, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
HPD emergency repair orders
3 completed HPD emergency repair orders since September 29, 2023, awarded for $2,820 in total. The most recent of the 3, a general construction order, was opened June 13, 2024.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C106 open most often Fire Safety
Fire SafetyNotice sent19242785
Fire SafetyNotice sent19242783
Fire SafetyNotice sent19242782
Fire SafetyNotice sent19242780
Fire SafetyNotice sent19242779
Fire SafetyNotice sent19242777
Fire SafetyNotice sent19242776
Fire SafetyNotice sent19242775
Fire SafetyNotice sent19242773
Fire SafetyNotice sent19242771
The report lists all 106, each with the city's own words and the date on its notice. What the report adds
Class B121 open most often Fire Safety
Notice sent19253457
Notice sent19253427
Notice sent19242795
Notice sent19242794
Notice sent19242793
Notice sent19242792
Notice sent19242791
Notice sent19242790
Notice sent19242789
Notice sent19242788
The report lists all 121, each with the city's own words and the date on its notice. What the report adds

The full report on 40 West Mosholu Parkway South, Bronx

Get the report on 40 West Mosholu Parkway South, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 40 West Mosholu Parkway South, Bronx have open violations?

Yes. 40 West Mosholu Parkway South, Bronx had 227 open violations on September 27, 2026: 227 from HPD. 106 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 20 years, since September 18, 2006.

Is 40 West Mosholu Parkway South, Bronx getting better or worse?

Certifications are being filed about as fast as new violations come in. 114 certifications filed and 78 new Class C in the last 180 days, neither far ahead. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 40 West Mosholu Parkway South, Bronx?

Since September 29, 2023, certifications were filed on 121 Class C violations: 110 by the original certify-by date, 11 after it. HPD now marks 3 of them False Certification and 4 Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 40 West Mosholu Parkway South, Bronx have active DOB violations?

Yes. 13 active DOB violations, most of them for construction. The newest was issued July 24, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 40 West Mosholu Parkway South, Bronx in housing court?

Yes. 1 open housing court case, opened May 16, 2025. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 40 West Mosholu Parkway South, Bronx?

Yes. 23 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 28, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 40 West Mosholu Parkway South, Bronx marked completed?

Yes. 3 completed HPD emergency repair orders since September 29, 2023, awarded for $2,820 in total. The most recent of the 3, a general construction order, was opened June 13, 2024. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 40 West Mosholu Parkway South, Bronx?

Rated Unsafe in the latest facade report, filed March 3, 2025 (inspection cycle 10). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 40 West Mosholu Parkway South, Bronx?

Yes. 5 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued September 22, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was the boiler at 40 West Mosholu Parkway South, Bronx last inspected?

It has 3 boilers, all inspected in 2026, the latest on August 19. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 40 West Mosholu Parkway South, Bronx last file its bedbug report?

Its 2 buildings had all filed by December 16, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 40 West Mosholu Parkway South, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 40 West Mosholu Parkway South, Bronx built?

The city's record gives 1975 as the year 40 West Mosholu Parkway South, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 42 floors.

How many apartments does 40 West Mosholu Parkway South, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 871 residential units at 40 West Mosholu Parkway South, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 40 West Mosholu Parkway…, Bronx: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/40-west-mosholu-parkway-south-bronx

How we count: /method.

Is this your building?