Skip to content
ViolationScout28 open Class C, with 2 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings315 West 102 Street, ManhattanCurrent through

315 West 102nd St, Manhattan

BBL 1-01890-0007

En español: 28 violaciones de Clase C abiertas (peligro inmediato) y 117 abiertas en total. La más antigua del HPD lleva 12 años abierta, desde el 28 de diciembre de 2013.

Open violations are sitting, with little movement either way. 28 open Class C, with 2 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 12 years, since December 28, 2013.

Since September 29, 2023, certifications were filed on 38 Class C violations: 34 by the original certify-by date, 4 after it. How certification works

Is this your building?

28 open Class C. The oldest open HPD violation was filed December 28, 2013.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
7 active DOB violations, most of them for construction. The newest was issued January 22, 2025.
DOB complaints
9 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 1, 2026.
DOB facade
Rated Safe in the latest facade report, filed October 31, 2024 (inspection cycle 9).
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected January 6, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C28 open most often Vermin / Infestation
Notice sent18975819WEST END FIRM, LLC
Notice sent18975814WEST END FIRM, LLC
Notice sent18470457WEST END FIRM, LLC
Vermin / InfestationNotice sent to tenant18470448WEST END FIRM, LLC
Vermin / InfestationNotice sent to tenant18470447WEST END FIRM, LLC
Heat / Hot WaterCertified late18341204WEST END FIRM, LLC
Heat / Hot WaterCertified late18341203WEST END FIRM, LLC
Certified late17884446
Vermin / InfestationInvalid certification17871252
Notice sent17636389
The report lists all 28, each with the city's own words and the date on its notice. What the report adds
Class B83 open most often Fire Safety
Fire SafetyNotice sent19191995
Fire SafetyNotice sent19191994
Notice sent19191993
Notice sent19191992
Notice sent19191991
Fire SafetyNotice sent18975822WEST END FIRM, LLC
Fire SafetyNotice sent18975821WEST END FIRM, LLC
Notice sent18559716WEST END FIRM, LLC
Notice sent18559714WEST END FIRM, LLC
Notice sent18559713WEST END FIRM, LLC
The report lists all 83, each with the city's own words and the date on its notice. What the report adds
OATH/ECB6 open most often Construction
Construction, Class 2Admitted39175787KWEST END FIRM, LLC
Construction, Class 2Decided by default39165795LWEST END FIRM, LLC
Construction, Class 2Found in violation37033378N
Construction, Class 1Found in violation39130877P
Construction, Class 3Admitted39119729X
Construction, Class 2Settled by agreement39111631L

The full report on 315 West 102nd St, Manhattan

Get the report on 315 West 102nd St, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 315 West 102 Street, Manhattan have open violations?

Yes. 315 West 102 Street, Manhattan had 117 open violations on September 27, 2026: 111 from HPD and 6 from OATH/ECB. 28 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 12 years, since December 28, 2013.

Is 315 West 102 Street, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 28 open Class C, with 2 certifications filed and 2 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 315 West 102 Street, Manhattan?

Since September 29, 2023, certifications were filed on 38 Class C violations: 34 by the original certify-by date, 4 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 315 West 102 Street, Manhattan have active DOB violations?

Yes. 7 active DOB violations, most of them for construction. The newest was issued January 22, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 315 West 102 Street, Manhattan?

Yes. 9 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 1, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 315 West 102 Street, Manhattan?

Rated Safe in the latest facade report, filed October 31, 2024 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When was the boiler at 315 West 102 Street, Manhattan last inspected?

On January 6, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 315 West 102 Street, Manhattan last file its bedbug report?

On December 5, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 315 West 102 Street, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 315 West 102 Street, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 315 West 102 Street, Manhattan built?

The city's record gives 1922 as the year 315 West 102 Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 9 floors.

How many apartments does 315 West 102 Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 36 residential units at 315 West 102 Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 315 West 102nd St, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/315-west-102-street-manhattan

How we count: /method.

Is this your building?