153 Lenox Ave, Manhattan
- Built 1920
- 5 floors
- 37 residential units
- Walk-up apartment building
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 18 de enero de 2015.
Certifications are being filed faster than new violations come in. 9 certifications filed against 1 new Class C in the last 180 days.
The oldest open HPD violation has been open 11 years, since January 18, 2015.
Since September 29, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. How certification works
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on October 1, 2026.
- DOB violations
- 16 active DOB violations, most of them for construction. The newest was issued January 16, 2025.
- DOB complaints
- 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 12, 2026.
- DOB permits
- 1 DOB work permit in effect, for General Construction work, issued November 17, 2025.
- Boiler inspection
- Inspected April 1, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed June 10, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 19245699 | ||
| Fire Safety | Notice sent | 18240890 | 153 LENOX HOLDING LLC | |
| Vermin / Infestation | Notice sent to tenant | 18240889 | 153 LENOX HOLDING LLC | |
| Vermin / Infestation | Notice sent to tenant | 18191050 | ||
| Vermin / Infestation | Notice sent to tenant | 17644050 | ||
| Vermin / Infestation | Not complied with | 17051769 | ||
| Vermin / Infestation | No access to reinspect (first try) | 16665277 | ||
| Vermin / Infestation | Not complied with | 16591274 | ||
| Vermin / Infestation | Not complied with | 16591273 | ||
| Mold | Not complied with | 16591267 | ||
| Class B | 12 open most often Mold | |||
| Mold | To be reinspected | 18557444 | 153 LENOX HOLDING LLC | |
| Notice sent | 18210092 | 153 LENOX HOLDING LLC | ||
| Mold | Defect letter sent | 18488311 | ||
| Notice sent | 17715939 | |||
| Notice sent | 17715936 | |||
| Notice sent | 17715932 | |||
| Notice sent | 17715927 | |||
| Notice sent | 17644052 | |||
| Notice sent | 17644051 | |||
| Not complied with | 17069602 | |||
| The report lists all 12, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 4 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39198052L | 153 LENOX HOLDING LLC | |
| Construction, Class 2 | Hearing pending | 39198051J | 153 LENOX HOLDING LLC | |
| Construction, Class 2 | Decided by default | 39117834Z | ||
| Construction, Class 1 | Decided by default | 39117589Y | ||
The full report on 153 Lenox Ave, Manhattan
- All 26 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 4 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 153 Lenox Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.