130 West 228th St, Manhattan
- Built 1930
- 6 floors
- 54 residential units
- Elevator apartment building
En español: 34 violaciones de Clase C abiertas (peligro inmediato) y 116 abiertas en total. La más antigua del HPD lleva 21 años abierta, desde el 10 de marzo de 2005.
Certifications are being filed faster than new violations come in. 14 certifications filed against 1 new Class C in the last 180 days.
The oldest open HPD violation has been open 21 years, since March 10, 2005.
Since September 29, 2023, certifications were filed on 55 Class C violations: 46 by the original certify-by date, 9 after it. HPD now marks 16 of them Invalid Certification. How certification works
- DOB violations
- 24 active DOB violations. The newest was issued November 14, 2025.
- Housing court
- 2 open housing court cases, most of them tenant actions. The newest opened December 26, 2025.
- DOB complaints
- 5 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 13, 2026.
- DOB facade
- No Report Filed for inspection cycle 9. Need this filed?
- Energy benchmarking
- ENERGY STAR score 64 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected December 22, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 1, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since September 29, 2023: a plumbing order, opened October 6, 2023, awarded for $3,995.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 34 open | |||
| Mold | Certified late | 18876964 | CHAMP 228 CO | |
| Lead Paint | Notice sent | 18644177 | CHAMP 228 CO | |
| Notice sent | 18636434 | CHAMP 228 CO | ||
| Vermin / Infestation | Notice sent to tenant | 18559745 | CHAMP 228 CO | |
| Vermin / Infestation | Notice sent to tenant | 18475962 | CHAMP 228 CO | |
| Heat / Hot Water | Notice sent | 18441762 | ||
| Heat / Hot Water | Notice sent | 18441761 | ||
| Vermin / Infestation | Notice sent to tenant | 18441760 | ||
| Vermin / Infestation | Notice sent to tenant | 17764050 | ||
| Vermin / Infestation | Notice sent to tenant | 17509248 | ||
| The report lists all 34, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 78 open most often Mold | |||
| Open | 19248413 | |||
| Open | 19248412 | |||
| Open | 19248411 | |||
| Open | 19248410 | |||
| Open | 19248409 | |||
| Invalid certification | 18876963 | CHAMP 228 CO | ||
| Invalid certification | 18744764 | CHAMP 228 CO | ||
| Invalid certification | 18744763 | CHAMP 228 CO | ||
| Invalid certification | 18744762 | CHAMP 228 CO | ||
| Mold | Defect letter sent | 18744761 | CHAMP 228 CO | |
| The report lists all 78, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 4 open | |||
| Local Law, Class 2 | Decided by default | 37036538R | CHAMP 228 CO | |
| Construction, Class 1 | Found in violation | 35690031L | ||
| Construction, Class 2 | Found in violation | 35687063Z | ||
| Local Law, Class 2 | Found in violation | 37026083K | ||
The full report on 130 West 228th St, Manhattan
- All 116 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 4 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 130 West 228th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.