109-25 Merrick Blvd, Queens
- Built 1963
- 6 floors
- 133 residential units
- Elevator apartment building
En español: 46 violaciones de Clase C abiertas (peligro inmediato) y 100 abiertas en total. La más antigua del HPD lleva 16 años abierta, desde el 25 de junio de 2010.
Certifications are being filed faster than new violations come in. 96 certifications filed against 26 new Class C in the last 180 days.
The oldest open HPD violation has been open 16 years, since June 25, 2010.
Since September 29, 2023, certifications were filed on 222 Class C violations, all 222 by the original certify-by date. How certification works
- DOB violations
- 5 active DOB violations. The newest was issued September 9, 2024.
- DOB complaints
- 4 DOB complaints in the 12 months to September 25, 2026. The newest was filed February 15, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed July 12, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- Energy benchmarking
- ENERGY STAR score 14 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected April 17, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed for its 2 buildings by May 4, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since September 29, 2023, awarded for $1,605 in total. The most recent of the 3, a general construction order, was opened May 23, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 46 open most often Vermin / Infestation | |||
| Fire Safety | Open | 19250413 | ||
| Fire Safety | Notice sent | 19239099 | ||
| Vermin / Infestation | Notice sent to tenant | 19239098 | ||
| Notice sent | 19239097 | |||
| Fire Safety | Notice sent | 19238897 | ||
| Fire Safety | Notice sent | 19229931 | ||
| Fire Safety | No access to reinspect (first try) | 19200131 | ||
| CIV14 mailed | 19200127 | |||
| CIV14 mailed | 19200121 | |||
| Vermin / Infestation | Notice sent to tenant | 19200120 | ||
| The report lists all 46, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 52 open most often Fire Safety | |||
| Open | 19250412 | |||
| Open | 19250411 | |||
| Open | 19250410 | |||
| Open | 19250409 | |||
| Open | 19250408 | |||
| Notice sent | 19239100 | |||
| Fire Safety | Notice sent | 19239096 | ||
| Fire Safety | Notice sent | 19239095 | ||
| Notice sent | 19239094 | |||
| Notice sent | 19239092 | |||
| The report lists all 52, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 2 open most often Construction | |||
| Construction, Class 1 | Found in violation | 39172632M | 109-15 MERRICK BLVD HOLDINGS LLC | |
| Construction, Class 1 | Found in violation | 39140960P | ||
The full report on 109-25 Merrick Blvd, Queens
- All 100 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 2 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Queens buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 109-25 Merrick Blvd, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.