1020 Boynton Ave
Bronx, NY 10472
1020 Boynton Avenue is an elevator building with 67 apartments, built in 1930. It has 69 open violations, 30 of them Class C, immediately hazardous. The oldest open HPD violation was filed on April 28, 2018.
En español: 30 violaciones de Clase C abiertas (peligro inmediato) y 69 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 28 de abril de 2018.
Open now, most hazardous first
- 30Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 35See the 35
Class B, hazardous, filed in the last 3 years. Most often Mold.
- 4See the 4
OATH/ECB summonses still active. Most often Construction.
4.5 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 101 certifications filed against 11 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 152 Class C violations: 151 by the original certify-by date, 1 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 65 open HPD violations run from January 26, 2024 to January 8, 2027.
- Zoning district
- R6
- Lot area
- 15,900 sq ft
- Floor area
- 66,456 sq ft
- Tax lot (BBL)
- 2-03715-0011
- Neighborhood
- Soundview-Bruckner-Bronx River
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 30 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 19339772 | JEFFMAR MANAGEMENT CORP | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19339771 | JEFFMAR MANAGEMENT CORP | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19332510 | JEFFMAR MANAGEMENT CORP | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Lead Paint | Defect letter sent | 19194462 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). Baseboard at north wall in the foyer | ||||
| Vermin / Infestation | Not complied with | 19174052 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Fire Safety | To be reinspected | 19174046 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance | ||||
| Vermin / Infestation | Not complied with | 19161219 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 19096172 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 19096171 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Mold | To be reinspected | 19096166 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at west, south, east and north wall in the bathroom | ||||
| Vermin / Infestation | Not complied with | 19085090 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| To be reinspected | 18969091 | |||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of vinyl tile at floor that is creating a trip hazard in the 2nd room from east | ||||
| Structural Hazard | Not complied with | 18947070 | ||
| § 27-2005 ADM CODE Make safe by properly repairing the structural defect lintel at 2nd window from north at northwest courtyard at west exterior wall, 6th story | ||||
| Structural Hazard | Not complied with | 18940409 | ||
| § 27-2005 ADM CODE Make safe by properly repairing the structural defect leaning parapet wall at west exterior wall facing southwest courtyard at roof | ||||
| To be reinspected | 18769771 | |||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment | ||||
| Lead Paint | Defect letter sent | 18346041 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, east wall in the 1st room from east at south | ||||
| Vermin / Infestation | Not complied with | 18334020 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 18141701 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Mold | Defect letter sent | 18221318 | ||
| Mold | Defect letter sent | 18221317 | ||
| Vermin / Infestation | Not complied with | 17999489 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 17890534 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 17729600 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 17324619 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 17022600 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 16781388 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Mold | Defect letter sent | 16662724 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... In the closet at ceiling approx 15 sq ft, at east wall approx 17 sq ft, at south wall approx 18 sq ft, at west wall approx 5 sq ft in the foyer | ||||
| Vermin / Infestation | Not complied with | 16644932 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Mold | Defect letter sent | 16546589 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... At west wall approx 27 sq ft, at south wall approx 9 sq ft, at ceiling approx 7 sq ft of the closet in the foyer | ||||
| Vermin / Infestation | Not complied with | 16546575 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 35 open most often Mold | |||
| Notice sent | 19403321 | JEFFMAR MANAGEMENT CORP | ||
| Notice sent | 19370491 | JEFFMAR MANAGEMENT CORP | ||
| Not complied with | 19343316 | JEFFMAR MANAGEMENT CORP | ||
| Not complied with | 19343315 | JEFFMAR MANAGEMENT CORP | ||
| Notice sent | 19315499 | JEFFMAR MANAGEMENT CORP | ||
| Mold | Defect letter sent | 19208058 | ||
| Not complied with | 19208026 | |||
| To be reinspected | 19161215 | |||
| To be reinspected | 19161214 | |||
| Mold | Defect letter sent | 19161211 | ||
| Not complied with | 19096130 | |||
| Mold | Defect letter sent | 19085092 | ||
| Mold | Defect letter sent | 19301516 | ||
| Not complied with | 18947072 | |||
| Not complied with | 18947071 | |||
| Structural Hazard | Not complied with | 18947065 | ||
| Structural Hazard | Not complied with | 18940413 | ||
| Structural Hazard | Not complied with | 18940411 | ||
| Structural Hazard | Not complied with | 18940410 | ||
| Structural Hazard | Not complied with | 18940404 | ||
| Structural Hazard | Not complied with | 18940399 | ||
| Not complied with | 18940387 | |||
| Structural Hazard | Not complied with | 18929901 | ||
| Mold | Defect letter sent | 18793157 | ||
| Fire Safety | No access to reinspect (first try) | 18340810 | ||
| Not complied with | 18334026 | |||
| Not complied with | 18207604 | |||
| Mold | Defect letter sent | 18366492 | ||
| Mold | Defect letter sent | 18209041 | ||
| Mold | Defect letter sent | 17989916 | ||
| Mold | Defect letter sent | 17235185 | ||
| Mold | Defect letter sent | 16883481 | ||
| Mold | Defect letter sent | 17112468 | ||
| Mold | Defect letter sent | 16546592 | ||
| Mold | Defect letter sent | 16545514 | ||
| OATH/ECB | 4 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 35730711Z | ||
| Construction, Class 1 | Hearing pending | 39188905P | ||
| Construction, Class 1 | Decided by default | 35726116M | ||
| Construction, Class 2 | Decided by default | 35482617M | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 93 on September 24, 2026 and 47 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 1,337 violations and closed 1,241, all classes.
Year Filed Closed 2026 292 412 2025 260 147 2024 168 233 2023 190 85 2022 158 145 2021 88 46 2020 26 49 2019 74 30 2018 38 45 2017 43 49 - Energy benchmarking
- ENERGY STAR score 15 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 6, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 17 completed HPD emergency repair orders since November 27, 2023, awarded for $25,733 in total. The most recent of the 17, a lead paint order, was opened July 29, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on November 27, 2026.
- OATH/ECB summonses
- 33 DOB summonses here since January 1, 2019, with $79,826 in penalties imposed. 4 of them are still active, the same 4 listed under OATH/ECB. 12 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- August 6, 2026, DOB: Failure to provide unobstructed exit passageway. $2,500 penalty imposed.
- May 16, 2026, DOB: Failure to maintain building walls or appurtenances. Adjourned, $5,000 penalty imposed.
- December 31, 2025, DOB: Failure to provide unobstructed exit passageway. Decided by default, $12,500 penalty imposed.
The newest 3 of 33 summonses OATH lists here.
- Housing court
- 5 housing court cases here since 2007, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 11 active DOB violations. The newest was issued August 6, 2026.
- DOB complaints
- 10 DOB complaints in the last 12 months. The newest was filed September 9, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 101 DOB complaints from 2002 through November 25, 2026. 49 DOB violations since 1996, 17 resolved and 21 dismissed in DOB's records.
- DOB facade
- No Report Filed for inspection cycle 9.
- DOB permits
- 4 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued November 4, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Sidewalk Shed, issued November 4, 2026, in effect until February 2, 2027.
- Suspended Scaffold, issued November 2, 2026, in effect until March 13, 2027.
- Supported Scaffold, issued October 26, 2026, in effect until March 13, 2027.
The newest 3 of 5 permits DOB NOW lists here.
- Boiler inspection
- Inspected August 20, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 41 other open violations this page lists without it.
- What each of the 8 city statuses here means, and how many of these carry it.
- How it compares with the 1,981 Bronx buildings with 50 to 99 apartments.
- All 5 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 33 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 4 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.