Skip to content
ViolationScout46 certifications filed against 7 new Class C in the last 180 days.Is this your building?
Buildings1019 Van Siclen Avenue, BrooklynCurrent through

1019 Van Siclen Ave, Brooklyn

BBL 3-04415-7501

En español: 21 violaciones de Clase C abiertas (peligro inmediato) y 48 abiertas en total. La más antigua del HPD lleva 23 años abierta, desde el 28 de mayo de 2003.

Certifications are being filed faster than new violations come in. 46 certifications filed against 7 new Class C in the last 180 days.

The oldest open HPD violation has been open 23 years, since May 28, 2003.

Since September 29, 2023, certifications were filed on 111 Class C violations: 110 by the original certify-by date, 1 after it. How certification works

Is this your building?

21 open Class C. The oldest open HPD violation was filed May 28, 2003.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
6 active DOB violations. The newest was issued February 4, 2022.
DOB permits
7 DOB work permits in effect. The latest, for General Construction work, was issued July 20, 2026.
Energy benchmarking
ENERGY STAR score 99 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
Bedbug report
Filed for its 6 buildings by December 22, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
2 completed HPD emergency repair orders since September 29, 2023, awarded for $825 in total. The most recent of the 2, a general construction order, was opened June 27, 2024.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C21 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant19200370
Vermin / InfestationNotice sent to tenant19200369
Vermin / InfestationNot complied with19149679MEADOWWOOD AT GATEWAY
Vermin / InfestationNot complied with19133765MEADOWWOOD AT GATEWAY
Vermin / InfestationNo access to reinspect (first try)19133763MEADOWWOOD AT GATEWAY
Fire SafetyNot complied with19058617MEADOWWOOD AT GATEWAY
Vermin / InfestationNotice sent to tenant19020779MEADOWWOOD AT GATEWAY
Fire SafetyNot complied with18592734MEADOWWOOD AT GATEWAY
Fire SafetyCIV14 mailed17845773
Vermin / InfestationNo access to reinspect (first try)17845770
The report lists all 21, each with the city's own words and the date on its notice. What the report adds
Class B27 open most often Fire Safety
Notice sent19200368
Notice sent19200367
Notice sent19200366
Notice sent19200365
Notice sent19200364
CIV14 mailed19108965MEADOWWOOD AT GATEWAY
CIV14 mailed19108964MEADOWWOOD AT GATEWAY
To be reinspected19070978MEADOWWOOD AT GATEWAY
CIV14 mailed19027289MEADOWWOOD AT GATEWAY
CIV14 mailed19027288MEADOWWOOD AT GATEWAY
The report lists all 27, each with the city's own words and the date on its notice. What the report adds

The full report on 1019 Van Siclen Ave, Brooklyn

Get the report on 1019 Van Siclen Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 1019 Van Siclen Avenue, Brooklyn have open violations?

Yes. 1019 Van Siclen Avenue, Brooklyn had 48 open violations on September 27, 2026: 48 from HPD. 21 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 23 years, since May 28, 2003.

Is 1019 Van Siclen Avenue, Brooklyn getting better or worse?

Certifications are being filed faster than new violations come in. 46 certifications filed against 7 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1019 Van Siclen Avenue, Brooklyn?

Since September 29, 2023, certifications were filed on 111 Class C violations: 110 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1019 Van Siclen Avenue, Brooklyn have active DOB violations?

Yes. 6 active DOB violations. The newest was issued February 4, 2022. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Are any HPD emergency repair orders at 1019 Van Siclen Avenue, Brooklyn marked completed?

Yes. 2 completed HPD emergency repair orders since September 29, 2023, awarded for $825 in total. The most recent of the 2, a general construction order, was opened June 27, 2024. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Are any DOB work permits in effect at 1019 Van Siclen Avenue, Brooklyn?

Yes. 7 DOB work permits in effect. The latest, for General Construction work, was issued July 20, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 1019 Van Siclen Avenue, Brooklyn?

ENERGY STAR score 99 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When did 1019 Van Siclen Avenue, Brooklyn last file its bedbug report?

Its 6 buildings had all filed by December 22, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 1019 Van Siclen Avenue, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 1019 Van Siclen Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

How many apartments does 1019 Van Siclen Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 550 residential units at 1019 Van Siclen Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1019 Van Siclen Ave, Brooklyn: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/1019-van-siclen-avenue-brooklyn

How we count: /method.

Is this your building?