Skip to content
ViolationScout33 certifications filed against 6 new Class C in the last 180 days.Is this your building?
Buildings792 Sterling Place, BrooklynCurrent through

792 Sterling Pl, Brooklyn

BBL 3-01247-0011

En español: 40 violaciones de Clase C abiertas (peligro inmediato) y 156 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 14 de noviembre de 2023.

Certifications are being filed faster than new violations come in. 33 certifications filed against 6 new Class C in the last 180 days.

The oldest open HPD violation has been open 2 years, since November 14, 2023.

Since September 29, 2023, certifications were filed on 86 Class C violations: 82 by the original certify-by date, 4 after it. HPD now marks 1 of them False Certification and 4 Invalid Certification. How certification works

Is this your building?

40 open Class C. The oldest open HPD violation was filed November 14, 2023.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
15 active DOB violations, most of them for elevator affirmations of correction. The newest was issued June 1, 2022.
Housing court
1 open housing court case, opened January 7, 2022.
DOB complaints
1 DOB complaint in the 12 months to September 25, 2026. It was filed January 26, 2026.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Bedbug report
Filed December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened December 11, 2024, awarded for $487.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C40 open most often Heat / Hot Water
Fire SafetyCertified on time19217319
Vermin / InfestationNotice sent to tenant19217318
Fire SafetyCertified on time19220785
Fire SafetyCIV14 mailed19192290
Fire SafetyCIV14 mailed19178797792 Sterling Holdings LLC
Heat / Hot WaterNotice sent18879396792 Sterling Holdings LLC
Notice sent18683370792 Sterling Holdings LLC
Heat / Hot WaterNotice sent18665017792 Sterling Holdings LLC
Heat / Hot WaterNotice sent18613453792 Sterling Holdings LLC
Notice sent18613450792 Sterling Holdings LLC
The report lists all 40, each with the city's own words and the date on its notice. What the report adds
Class B111 open most often Heat / Hot Water
Notice sent19192291
Heat / Hot WaterNotice sent19070280792 Sterling Holdings LLC
Heat / Hot WaterNotice sent19070279792 Sterling Holdings LLC
False certification18939145792 Sterling Holdings LLC
False certification18939144792 Sterling Holdings LLC
Heat / Hot WaterNot complied with18939142792 Sterling Holdings LLC
Heat / Hot WaterNotice sent18939122792 Sterling Holdings LLC
False certification18879407792 Sterling Holdings LLC
Heat / Hot WaterNot complied with18879404792 Sterling Holdings LLC
Fire SafetyFalse certification18879402792 Sterling Holdings LLC
The report lists all 111, each with the city's own words and the date on its notice. What the report adds
OATH/ECB5 open most often Elevators
Elevators, Class 2Settled by agreement39176103P792 Sterling Holdings LLC
Elevators, Class 2Settled by agreement39176102N792 Sterling Holdings LLC
Elevators, Class 2Settled by agreement39174497H792 Sterling Holdings LLC
Elevators, Class 2Settled by agreement39174496X792 Sterling Holdings LLC
Elevators, Class 1Found in violation39097379K

The full report on 792 Sterling Pl, Brooklyn

Get the report on 792 Sterling Pl, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is heat and hot water.

Nearby buildings

Questions about this building

Does 792 Sterling Place, Brooklyn have open violations?

Yes. 792 Sterling Place, Brooklyn had 156 open violations on September 27, 2026: 151 from HPD and 5 from OATH/ECB. 40 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since November 14, 2023.

Is 792 Sterling Place, Brooklyn getting better or worse?

Certifications are being filed faster than new violations come in. 33 certifications filed against 6 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 792 Sterling Place, Brooklyn?

Since September 29, 2023, certifications were filed on 86 Class C violations: 82 by the original certify-by date, 4 after it. HPD now marks 1 of them False Certification and 4 Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 792 Sterling Place, Brooklyn have active DOB violations?

Yes. 15 active DOB violations, most of them for elevator affirmations of correction. The newest was issued June 1, 2022. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 792 Sterling Place, Brooklyn in housing court?

Yes. 1 open housing court case, opened January 7, 2022. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 792 Sterling Place, Brooklyn?

Yes. 1 DOB complaint in the 12 months to September 25, 2026. It was filed January 26, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 792 Sterling Place, Brooklyn marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened December 11, 2024, awarded for $487. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When did 792 Sterling Place, Brooklyn last file its bedbug report?

On December 3, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 792 Sterling Place, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 792 Sterling Place, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 792 Sterling Place, Brooklyn built?

The city's record gives 2007 as the year 792 Sterling Place, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 5 floors.

How many apartments does 792 Sterling Place, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 82 residential units at 792 Sterling Place, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 792 Sterling Pl, Brooklyn: 40 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/792-sterling-place-brooklyn

How we count: /method.

Is this your building?