750 Pelham Parkway South, Bronx
- Built 1928
- 6 floors
- 139 residential units
- Elevator apartment building
En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 85 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 6 de mayo de 2018.
Open violations are sitting, with little movement either way. 16 open Class C, with 6 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
The oldest open HPD violation has been open 8 years, since May 6, 2018.
Since September 29, 2023, certifications were filed on 28 Class C violations, all 28 by the original certify-by date. HPD now marks 1 of them False Certification. How certification works
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since March 2, 2026. Reason on the order: fire damage.
- OATH hearings
- 7 hearings scheduled on DOB summonses, the first on October 2, 2026.
- DOB violations
- 21 active DOB violations, most of them for the annual elevator inspection. The newest was issued October 2, 2024.
- Housing court
- 2 open housing court cases. The newest opened September 18, 2025.
- DOB complaints
- 7 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 23, 2026.
- DOB facade
- No Report Filed for inspection cycle 9. Need this filed?
- Certificate of occupancy
- Final, issued November 30, 2018.
- Energy benchmarking
- ENERGY STAR score 89 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on March 26. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed May 8, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since September 29, 2023, awarded for $2,487 in total. The most recent of the 2, a general construction order, was opened August 22, 2024.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 16 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 18274695 | 2206 REALTY CORP | |
| Vermin / Infestation | Notice sent to tenant | 18274694 | 2206 REALTY CORP | |
| Vermin / Infestation | Notice sent to tenant | 18219112 | 2206 REALTY CORP | |
| Vermin / Infestation | Notice sent to tenant | 17201294 | ||
| Fire Safety | Not complied with | 17099246 | ||
| Vermin / Infestation | Notice sent to tenant | 17035272 | ||
| Notice sent | 16670481 | |||
| Vermin / Infestation | Notice sent to tenant | 16670477 | ||
| Vermin / Infestation | Notice sent to tenant | 16670476 | ||
| Notice sent | 16670474 | |||
| The report lists all 16, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 56 open | |||
| Notice sent | 18974741 | 2206 REALTY CORP | ||
| Fire Safety | Notice sent | 18974740 | 2206 REALTY CORP | |
| Fire Safety | Notice sent | 18974739 | 2206 REALTY CORP | |
| Notice sent | 18974737 | 2206 REALTY CORP | ||
| Notice sent | 18974736 | 2206 REALTY CORP | ||
| Mold | Notice sent to tenant | 18665206 | 2206 REALTY CORP | |
| Notice sent | 18318937 | 2206 REALTY CORP | ||
| Mold | Defect letter sent | 18214861 | ||
| Mold | Defect letter sent | 18214860 | ||
| Fire Safety | Notice sent | 17870824 | ||
| The report lists all 56, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 13 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39558194N | 2206 REALTY CORP | |
| Class 2 | Hearing pending | 39558193L | 2206 REALTY CORP | |
| Construction, Class 2 | Hearing pending | 35730859P | 2206 REALTY CORP | |
| Construction, Class 1 | Hearing pending | 35730858N | 2206 REALTY CORP | |
| Construction, Class 2 | Hearing pending | 39557076H | 2206 REALTY CORP | |
| Construction, Class 1 | Hearing pending | 39188319M | 2206 REALTY CORP | |
| Construction, Class 2 | Found in violation | 35683853P | ||
| Construction, Class 1 | Found in violation | 35685238M | ||
| Construction, Class 1 | Hearing pending | 35685237K | ||
| Local Law, Class 2 | Found in violation | 37027583L | ||
| The report lists all 13, each with the city's own words and the date on its notice. What the report adds | ||||
The full report on 750 Pelham Parkway South, Bronx
- All 85 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 13 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 750 Pelham Parkway South, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.