Skip to content
ViolationScout16 certifications filed against 2 new Class C in the last 180 days.Is this your building?
Buildings60 Seaman Avenue, ManhattanCurrent through

60 Seaman Ave, Manhattan

BBL 1-02248-0040

En español: 21 violaciones de Clase C abiertas (peligro inmediato) y 60 abiertas en total. La más antigua del HPD lleva 14 años abierta, desde el 21 de noviembre de 2011.

Certifications are being filed faster than new violations come in. 16 certifications filed against 2 new Class C in the last 180 days.

The oldest open HPD violation has been open 14 years, since November 21, 2011.

Since September 29, 2023, certifications were filed on 9 Class C violations, all 9 by the original certify-by date. How certification works

Is this your building?

21 open Class C, 2 OATH hearings starting October 1, 2026, and no facade report filed for inspection cycle 9. The oldest open HPD violation was filed November 21, 2011.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

OATH hearings
2 hearings scheduled on DOB summonses, the first on October 1, 2026.
DOB violations
5 active DOB violations, most of them for not posting the energy grade. The newest was issued July 24, 2026.
DOB complaints
11 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 14, 2026.
DOB facade
No Report Filed for inspection cycle 9. Need this filed?
Energy benchmarking
ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected November 24, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
Bedbug report
Filed January 20, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
4 completed HPD emergency repair orders since September 29, 2023, awarded for $5,675 in total. The most recent of the 4, a general construction order, was opened May 19, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C21 open most often Lead Paint
Vermin / InfestationNot complied with18988667INWOOD PARK ASSOCIATES
Lead PaintNotice sent18975061INWOOD PARK ASSOCIATES
Notice sent18527117INWOOD PARK ASSOCIATES
Heat / Hot WaterNotice sent18524908INWOOD PARK ASSOCIATES
Lead PaintNotice sent17729302
Lead PaintNotice sent17729243
Lead PaintNotice sent17729242
Lead PaintNotice sent17729241
Lead PaintNotice sent17729240
Heat / Hot WaterNotice sent17414501
The report lists all 21, each with the city's own words and the date on its notice. What the report adds
Class B31 open most often Mold
Notice sent19146068INWOOD PARK ASSOCIATES
Notice sent19146066INWOOD PARK ASSOCIATES
Notice sent19077800INWOOD PARK ASSOCIATES
Notice sent19077799INWOOD PARK ASSOCIATES
Notice sent19077798INWOOD PARK ASSOCIATES
MoldNo access to reinspect (first try)18628425INWOOD PARK ASSOCIATES
Notice sent18565422INWOOD PARK ASSOCIATES
Notice sent18565421INWOOD PARK ASSOCIATES
Notice sent18565420INWOOD PARK ASSOCIATES
Notice sent18565419INWOOD PARK ASSOCIATES
The report lists all 31, each with the city's own words and the date on its notice. What the report adds
OATH/ECB8 open most often Construction
Class 2Hearing pending39557647MINWOOD PARK ASSOCIATES
Construction, Class 1Hearing pending39197610MINWOOD PARK ASSOCIATES
Elevators, Class 2Hearing pending39196927XINWOOD PARK ASSOCIATES
Construction, Class 2Decided by default39176418JINWOOD PARK ASSOCIATES
Construction, Class 2Decided by default39160321R
Elevators, Class 2Decided by default39149748Z
Construction, Class 2Decided by default35685397J
Construction, Class 1Decided by default35685298Y

The full report on 60 Seaman Ave, Manhattan

Get the report on 60 Seaman Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is mold.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 60 Seaman Avenue, Manhattan have open violations?

Yes. 60 Seaman Avenue, Manhattan had 60 open violations on September 27, 2026: 52 from HPD and 8 from OATH/ECB. 21 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 14 years, since November 21, 2011.

Is 60 Seaman Avenue, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 16 certifications filed against 2 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 60 Seaman Avenue, Manhattan?

Since September 29, 2023, certifications were filed on 9 Class C violations, all 9 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 60 Seaman Avenue, Manhattan have an OATH hearing coming up?

Yes. 2 hearings scheduled on DOB summonses, the first on October 1, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 60 Seaman Avenue, Manhattan have active DOB violations?

Yes. 5 active DOB violations, most of them for not posting the energy grade. The newest was issued July 24, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 60 Seaman Avenue, Manhattan?

Yes. 11 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 14, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 60 Seaman Avenue, Manhattan marked completed?

Yes. 4 completed HPD emergency repair orders since September 29, 2023, awarded for $5,675 in total. The most recent of the 4, a general construction order, was opened May 19, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 60 Seaman Avenue, Manhattan?

No Report Filed for inspection cycle 9. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

What is the ENERGY STAR score for 60 Seaman Avenue, Manhattan?

ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 60 Seaman Avenue, Manhattan last inspected?

On November 24, 2025. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 60 Seaman Avenue, Manhattan last file its bedbug report?

On January 20, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 60 Seaman Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 60 Seaman Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 60 Seaman Avenue, Manhattan built?

The city's record gives 1925 as the year 60 Seaman Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 60 Seaman Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 61 residential units at 60 Seaman Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 60 Seaman Ave, Manhattan: 21 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/60-seaman-avenue-manhattan

How we count: /method.

Is this your building?