565 West 139th St, Manhattan
- Built 1910
- 6 floors
- 36 residential units
- Elevator apartment building
En español: 17 violaciones de Clase C abiertas (peligro inmediato) y 39 abiertas en total. La más antigua del HPD lleva 16 años abierta, desde el 24 de marzo de 2010.
Certifications are being filed about as fast as new violations come in. 29 certifications filed and 15 new Class C in the last 180 days, neither far ahead.
The oldest open HPD violation has been open 16 years, since March 24, 2010.
Since September 29, 2023, certifications were filed on 44 Class C violations: 37 by the original certify-by date, 7 after it. How certification works
- DOB violations
- 2 active DOB violations. The newest was issued June 10, 2015.
- Housing court
- 1 open housing court case, opened March 15, 2022.
- Energy benchmarking
- ENERGY STAR score 55 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected July 24, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed January 9, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 17 open most often Lead Paint | ||
| Vermin / Infestation | To be reinspected | 19012597 | |
| Vermin / Infestation | To be reinspected | 19009133 | |
| Vermin / Infestation | To be reinspected | 19009132 | |
| Vermin / Infestation | To be reinspected | 19007469 | |
| Vermin / Infestation | To be reinspected | 19007468 | |
| Lead Paint | Postponement granted | 18853718 | |
| Lead Paint | Postponement granted | 18853717 | |
| Lead Paint | Postponement granted | 18853716 | |
| Lead Paint | Postponement granted | 18853715 | |
| Lead Paint | Postponement granted | 18853713 | |
| The report lists all 17, each with the city's own words and the date on its notice. What the report adds | |||
| Class B | 21 open most often Fire Safety | ||
| Fire Safety | CIV14 mailed | 19088766 | |
| Fire Safety | CIV14 mailed | 19088765 | |
| Fire Safety | CIV14 mailed | 19012599 | |
| Fire Safety | CIV14 mailed | 19012598 | |
| Notice sent | 19012596 | ||
| Fire Safety | CIV14 mailed | 19012591 | |
| Fire Safety | CIV14 mailed | 19012590 | |
| Notice sent | 19031837 | ||
| Notice sent | 19031836 | ||
| Fire Safety | Notice sent | 19009141 | |
| The report lists all 21, each with the city's own words and the date on its notice. What the report adds | |||
| OATH/ECB | 1 open | ||
| Construction, Class 2 | Found in violation | 39145048J | |
The full report on 565 West 139th St, Manhattan
- All 39 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 1 OATH/ECB summons with its hearing date and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 565 West 139th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.