Skip to content
ViolationScout17 certifications filed against 4 new Class C in the last 180 days.Is this your building?
Buildings41 Elliot Place, BronxCurrent through

41 Elliot Pl, Bronx

BBL 2-02842-0023

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 25 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 19 de noviembre de 2014.

Certifications are being filed faster than new violations come in. 17 certifications filed against 4 new Class C in the last 180 days.

The oldest open HPD violation has been open 11 years, since November 19, 2014.

Since September 29, 2023, certifications were filed on 200 Class C violations, all 200 by the original certify-by date. How certification works

Is this your building?

14 open Class C. The oldest open HPD violation was filed November 19, 2014.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
1 active DOB violation, issued December 1, 2021.
Housing court
1 open housing court case, opened August 19, 2026.
Local Law 97
On the covered list (DOB's list, March 1, 2026).
Boiler inspection
Inspected May 15, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 1, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened December 6, 2023, awarded for $295.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C14 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant19205450ELLIOT PLACE ESTATES LLC
Vermin / InfestationNotice sent to tenant19205449ELLIOT PLACE ESTATES LLC
Vermin / InfestationCIV14 mailed19130310ELLIOT PLACE ESTATES LLC
Vermin / InfestationCIV14 mailed19130309ELLIOT PLACE ESTATES LLC
Vermin / InfestationNo access to reinspect (first try)18064091
Vermin / InfestationNo access to reinspect (first try)17928029
Vermin / InfestationNo access to reinspect (first try)17881215
Vermin / InfestationNo access to reinspect (first try)17832024
Vermin / InfestationNot complied with17760821
Not complied with17760818
The report lists all 14, each with the city's own words and the date on its notice. What the report adds
Class B11 open most often Fire Safety
Notice sent19222280ELLIOT PLACE ESTATES LLC
Fire SafetyNotice sent19222279ELLIOT PLACE ESTATES LLC
Fire SafetyNotice sent19222278ELLIOT PLACE ESTATES LLC
Fire SafetyCIV14 mailed19130308ELLIOT PLACE ESTATES LLC
Fire SafetyCIV14 mailed19130307ELLIOT PLACE ESTATES LLC
Fire SafetyNo access to reinspect (first try)18044117
Fire SafetyNo access to reinspect (first try)18044116
Fire SafetyNo access to reinspect (first try)17928031
Fire SafetyNo access to reinspect (first try)17928030
Not complied with17760815
The report lists all 11, each with the city's own words and the date on its notice. What the report adds

The full report on 41 Elliot Pl, Bronx

Get the report on 41 Elliot Pl, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 41 Elliot Place, Bronx have open violations?

Yes. 41 Elliot Place, Bronx had 25 open violations on September 27, 2026: 25 from HPD. 14 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 11 years, since November 19, 2014.

Is 41 Elliot Place, Bronx getting better or worse?

Certifications are being filed faster than new violations come in. 17 certifications filed against 4 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 41 Elliot Place, Bronx?

Since September 29, 2023, certifications were filed on 200 Class C violations, all 200 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 41 Elliot Place, Bronx have active DOB violations?

Yes. 1 active DOB violation, issued December 1, 2021. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 41 Elliot Place, Bronx in housing court?

Yes. 1 open housing court case, opened August 19, 2026. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Are any HPD emergency repair orders at 41 Elliot Place, Bronx marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened December 6, 2023, awarded for $295. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was the boiler at 41 Elliot Place, Bronx last inspected?

On May 15, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 41 Elliot Place, Bronx last file its bedbug report?

On December 1, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 41 Elliot Place, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. On the covered list (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 41 Elliot Place, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 41 Elliot Place, Bronx built?

The city's record gives 1923 as the year 41 Elliot Place, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 5 floors.

How many apartments does 41 Elliot Place, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 68 residential units at 41 Elliot Place, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 41 Elliot Pl, Bronx: 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/41-elliot-place-bronx

How we count: /method.

Is this your building?