Skip to content
ViolationScout20 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings331 Edgecombe Avenue, ManhattanCurrent through

331 Edgecombe Ave, Manhattan

BBL 1-02053-0090

En español: 20 violaciones de Clase C abiertas (peligro inmediato) y 50 abiertas en total. La más antigua del HPD lleva 34 años abierta, desde el 16 de septiembre de 1992.

Open violations are sitting, with little movement either way. 20 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 34 years, since September 16, 1992.

Since September 29, 2023, certifications were filed on 29 Class C violations, all 29 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works

Is this your building?

20 open Class C and no facade report filed for inspection cycle 9. The oldest open HPD violation was filed September 16, 1992.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
14 active DOB violations, most of them for low-pressure boilers. The newest was issued September 23, 2024.
DOB complaints
4 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 31, 2026.
DOB facade
No Report Filed for inspection cycle 9. Need this filed?
Energy benchmarking
ENERGY STAR score 52 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026).
Boiler inspection
3 boilers, all inspected in 2026, the latest on March 5. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed June 10, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened October 18, 2025, awarded for $270.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C20 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant18781699770 ST NICHOLAS LLC
Fire SafetyNotice sent18597327770 ST NICHOLAS LLC
MoldNotice sent to tenant18565735770 ST NICHOLAS LLC
Vermin / InfestationNotice sent to tenant18565734770 ST NICHOLAS LLC
Vermin / InfestationNotice sent to tenant18565733770 ST NICHOLAS LLC
MoldNotice sent to tenant18548207770 ST NICHOLAS LLC
Fire SafetyNot complied with18525551770 ST NICHOLAS LLC
Notice sent18525550770 ST NICHOLAS LLC
Heat / Hot WaterNotice sent18525549770 ST NICHOLAS LLC
Notice sent18488921770 ST NICHOLAS LLC
The report lists all 20, each with the city's own words and the date on its notice. What the report adds
Class B28 open
MoldNotice sent to tenant19135234770 ST NICHOLAS LLC
Notice sent18512925770 ST NICHOLAS LLC
Notice sent18247915770 ST NICHOLAS LLC
Notice sent18167817770 ST NICHOLAS LLC
Notice sent18167816770 ST NICHOLAS LLC
Notice sent18167815770 ST NICHOLAS LLC
Notice sent18167814770 ST NICHOLAS LLC
Notice sent18167813770 ST NICHOLAS LLC
Notice sent18141807
Notice sent18141806
The report lists all 28, each with the city's own words and the date on its notice. What the report adds
OATH/ECB2 open
Local Law, Class 2Decided by default37034717N
Elevators, Class 2Decided by default39125393M

The full report on 331 Edgecombe Ave, Manhattan

Get the report on 331 Edgecombe Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 331 Edgecombe Avenue, Manhattan have open violations?

Yes. 331 Edgecombe Avenue, Manhattan had 50 open violations on September 27, 2026: 48 from HPD and 2 from OATH/ECB. 20 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 34 years, since September 16, 1992.

Is 331 Edgecombe Avenue, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 20 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 331 Edgecombe Avenue, Manhattan?

Since September 29, 2023, certifications were filed on 29 Class C violations, all 29 by the original certify-by date. HPD now marks 1 of them Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 331 Edgecombe Avenue, Manhattan have active DOB violations?

Yes. 14 active DOB violations, most of them for low-pressure boilers. The newest was issued September 23, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 331 Edgecombe Avenue, Manhattan?

Yes. 4 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 31, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 331 Edgecombe Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened October 18, 2025, awarded for $270. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 331 Edgecombe Avenue, Manhattan?

No Report Filed for inspection cycle 9. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

What is the ENERGY STAR score for 331 Edgecombe Avenue, Manhattan?

ENERGY STAR score 52 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 331 Edgecombe Avenue, Manhattan last inspected?

It has 3 boilers, all inspected in 2026, the latest on March 5. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 331 Edgecombe Avenue, Manhattan last file its bedbug report?

On June 10, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 331 Edgecombe Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 331 Edgecombe Avenue, Manhattan built?

The city's record gives 1902 as the year 331 Edgecombe Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 7 floors.

How many apartments does 331 Edgecombe Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 44 residential units at 331 Edgecombe Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB complaints, DOB facade filings, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB complaints, DOB facade filings, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 331 Edgecombe Ave, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/331-edgecombe-avenue-manhattan

How we count: /method.

Is this your building?