1925 Eastchester Rd, Bronx
- Built 1972
- 28 floors
- Educational facility
En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 23 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 22 de julio de 2015.
Open violations are sitting, with little movement either way. 12 open Class C, with nothing filed or new in the last 180 days.
The oldest open HPD violation has been open 11 years, since July 22, 2015.
Since September 29, 2023, a certification was filed on 1 Class C violation, after the original certify-by date. How certification works
- OATH hearings
- A hearing on a DOB summons is set for December 4, 2026.
- DOB violations
- 10 active DOB violations, most of them for facade reports not filed or filed late. The newest was issued November 22, 2024.
- Housing court
- 1 open housing court case, opened April 22, 2026.
- DOB complaints
- 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 17, 2026.
- DOB facade
- Rated Unsafe in the latest facade report, filed September 26, 2025 (inspection cycle 10). Need this filed?
- DOB permits
- 5 DOB work permits in effect. The latest, for General Construction work, was issued September 14, 2026.
- Certificate of occupancy
- Final, issued September 18, 2020.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 12 open most often Heat / Hot Water | |||
| Heat / Hot Water | Notice sent | 18715143 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18660363 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18660362 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Certified late | 18652637 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18645479 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18645478 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18645477 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18645476 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| Heat / Hot Water | Notice sent | 18623022 | ||
| Heat / Hot Water | Notice sent | 18555605 | ||
| The report lists all 12, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 1 open | |||
| Heat / Hot Water | Notice sent | 18660364 | ALBERT EINSTEIN COLLEGE OF MEDICINE STAFF HOUSING | |
| OATH/ECB | 10 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39559406K | ||
| Construction, Class 2 | Settled by agreement | 35718463R | ||
| Construction, Class 1 | Found in violation | 35686599M | ||
| Construction, Class 1 | Found in violation | 35686598K | ||
| Construction, Class 1 | Found in violation | 35686597Z | ||
| Construction, Class 1 | Found in violation | 35686330J | ||
| Construction, Class 1 | Found in violation | 35686329M | ||
| Construction, Class 1 | Found in violation | 35686328K | ||
| Construction, Class 2 | Found in violation | 37028413N | ||
| Construction, Class 2 | Found in violation | 37028411J | ||
The full report on 1925 Eastchester Rd, Bronx
- All 23 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 10 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 1925 Eastchester Rd, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.