Skip to content
ViolationScout13 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings1898 Billingsley Terrace, BronxCurrent through

1898 Billingsley Ter, Bronx

BBL 2-02879-0263

En español: 13 violaciones de Clase C abiertas (peligro inmediato) y 24 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 3 de julio de 2019.

Open violations are sitting, with little movement either way. 13 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 7 years, since July 3, 2019.

Since September 29, 2023, certifications were filed on 5 Class C violations, all 5 by the original certify-by date. How certification works

Is this your building?

13 open Class C. The oldest open HPD violation was filed July 3, 2019.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

Alternative Enforcement Program
In HPD's Alternative Enforcement Program since January 31, 2023.
DOB violations
16 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued April 25, 2023.
Housing court
1 open housing court case, opened November 2, 2023.
Boiler inspection
Inspected July 14, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C13 open most often Vermin / Infestation
Notice sent18814130BILLINGSLEY TERRACE HOUSING CO
Notice sent18814126BILLINGSLEY TERRACE HOUSING CO
Vermin / InfestationDefect letter sent18800870BILLINGSLEY TERRACE HOUSING CO
Vermin / InfestationDefect letter sent18754137BILLINGSLEY TERRACE HOUSING CO
Heat / Hot WaterNo access to reinspect (first try)18603976BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18603973BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405069BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405068BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405059BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405054BILLINGSLEY TERRACE HOUSING CO
The report lists all 13, each with the city's own words and the date on its notice. What the report adds
Class B10 open most often Mold
Not complied with18806869BILLINGSLEY TERRACE HOUSING CO
Not complied with18800881BILLINGSLEY TERRACE HOUSING CO
Not complied with18800872BILLINGSLEY TERRACE HOUSING CO
MoldNo access to reinspect (first try)18405085BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405063BILLINGSLEY TERRACE HOUSING CO
No access to reinspect (first try)18405052BILLINGSLEY TERRACE HOUSING CO
Not complied with18237703
Defect letter sent18036034
No access to reinspect (first try)17654469
MoldDefect letter sent18415381
OATH/ECB1 open
Boilers, Class 2Found in violation39161320JBILLINGSLEY TERRACE HOUSING CO

The full report on 1898 Billingsley Ter, Bronx

Get the report on 1898 Billingsley Ter, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1898 Billingsley Terrace, Bronx have open violations?

Yes. 1898 Billingsley Terrace, Bronx had 24 open violations on September 27, 2026: 23 from HPD and 1 from OATH/ECB. 13 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 7 years, since July 3, 2019.

Is 1898 Billingsley Terrace, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 13 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1898 Billingsley Terrace, Bronx?

Since September 29, 2023, certifications were filed on 5 Class C violations, all 5 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is 1898 Billingsley Terrace, Bronx in HPD's Alternative Enforcement Program?

Yes. In HPD's Alternative Enforcement Program since January 31, 2023. HPD puts a group of buildings with serious, long-running violations into the program each year. While a building is in it, HPD can make repairs itself and charge the cost to the property, and the building stays in until HPD discharges it.

Does 1898 Billingsley Terrace, Bronx have active DOB violations?

Yes. 16 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued April 25, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 1898 Billingsley Terrace, Bronx in housing court?

Yes. 1 open housing court case, opened November 2, 2023. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

When was the boiler at 1898 Billingsley Terrace, Bronx last inspected?

On July 14, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

Is 1898 Billingsley Terrace, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 1898 Billingsley Terrace, Bronx built?

The city's record gives 1926 as the year 1898 Billingsley Terrace, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 5 floors.

How many apartments does 1898 Billingsley Terrace, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 27 residential units at 1898 Billingsley Terrace, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD's Alternative Enforcement Program list, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD's Alternative Enforcement Program list, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1898 Billingsley Ter, Bronx: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/1898-billingsley-terrace-bronx

How we count: /method.

Is this your building?