Skip to content
ViolationScout15 certifications filed against 5 new Class C in the last 180 days.Your building
Buildings162 East 19 Street, BrooklynCurrent through

162 East 19th St

Flatbush, Brooklyn, NY 11226

162 East 19th Street is a walk-up building with 16 apartments, built in 1916. It has 33 open violations, 24 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 12, 1997.

En español: 24 violaciones de Clase C abiertas (peligro inmediato) y 33 abiertas en total. La más antigua del HPD lleva 29 años abierta, desde el 12 de septiembre de 1997.

Open now, most hazardous first

  1. 24

    Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.

    49 open counting every year, the oldest since

    Get these certified
  2. 9

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 9

15.0 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 15 certifications filed against 5 new Class C in the last 180 days.

Since November 27, 2023, certifications were filed on 18 Class C violations: 16 by the original certify-by date, 2 after it. HPD now marks 1 of them False Certification. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 33 open HPD violations run from March 4, 2024 to November 29, 2026.

Zoning district
R7A
Lot area
6,250 sq ft
Floor area
17,360 sq ft
Tax lot (BBL)
3-05122-0025

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C24 open most often Heat / Hot Water
Heat / Hot WaterNotice sent19375262CLB HOLDING LLC
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room
Heat / Hot WaterNotice sent19375261CLB HOLDING LLC
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent19375260CLB HOLDING LLC
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterInvalid certification19096301
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room
Heat / Hot WaterNotice sent19096295
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18933589
§ 27-2033 ADM CODE Provide ready access to buildings heating system door at cellar locked at boiler room
Heat / Hot WaterNotice sent18933586
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18933585
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent18933580
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from east at north
Heat / Hot WaterNotice sent18658016
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18658014
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room
Notice sent18658012
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 1st room from east at north
Structural HazardNotice sent18658009
§ 27-2005 ADM CODE Make safe by properly repairing the structural defect wood roof joists, 5th, 6th and 7th from east at ceiling in the 5th room from east
Notice sent18658008
§ 27-2005 ADM CODE Replace with new the missing sheetrock at ceiling in the 5th room from east
Notice sent18658005
§ 27-2005 ADM CODE Repair the roof so that it will not leak over ceiling in the 5th room from east
Notice sent18655054
§ 27-2005 HMC: Properly repair or replace the broken or defective the ceiling in the 1st room from north at west
Heat / Hot WaterNotice sent18472854
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at 1st story public hall at boiler room, 1st story
Heat / Hot WaterNotice sent18441741
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18441740
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement at boiler room
Heat / Hot WaterNotice sent18441739
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18354624
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked door at cellar at boiler room
Heat / Hot WaterNotice sent18354623
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17567084
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room
Heat / Hot WaterFalse certification16681061
§ 27-2033 ADM CODE Provide ready access to buildings heating system boileer room locked at cellar
In HPD's words. Apartment numbers are left out.
Class B9 open most often Mold
MoldNotice sent to tenant19261321
MoldNotice sent to tenant19261320
MoldNotice sent to tenant19261319
Fire SafetyNotice sent18933588
Fire SafetyNotice sent18933587
Not complied with18933584
Not complied with18933583
Notice sent16732891
False certification16592008
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
24 on September 24, 2026 and 21 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 248 violations and closed 225, all classes.
YearFiledClosed
20265035
20252315
20242214
20232612
202112
2020123
20196546
2018520
20175558
Bedbug report
Filed May 24, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair order
1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened December 11, 2024, awarded for $489. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH/ECB summonses
4 DOB summonses here since January 1, 2019, with $6,250 in penalties imposed.
  • March 12, 2026, DOB: Failure to maintain building in code-compliant manner. In violation.
  • March 12, 2026, DOB: Failure to maintain per BC1008.1.8; 27-371; BC1008.1.9;BC1010.1.8;BC1010.1.9. In violation.
  • February 17, 2026, DOB: Failure to maintain building in code-compliant manner. Adjourned, $6,250 penalty imposed.

The newest 3 of 4 summonses OATH lists here.

Housing court
1 open housing court case, opened December 13, 2023. 8 housing court cases here since 2008. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
2 active DOB violations, most of them for construction. The newest was issued February 17, 2026.
DOB complaints
6 DOB complaints in the last 12 months. The newest was filed March 12, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
21 DOB complaints from 1994 through November 25, 2026. 10 DOB violations since 1994, 8 dismissed in DOB's records.
DOB permits
DOB NOW lists 1 work permit here: General Construction, issued May 27, 2026, expired August 22, 2026.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is heat and hot water.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 162 East 19th St have open violations?

Yes. It had 33 open violations on November 25, 2026: 33 from HPD. 24 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 29 years, since September 12, 1997.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 15 certifications filed against 5 new Class C in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 162 East 19th St, Brooklyn: 16 units, 24 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/162-east-19-street-brooklyn

How we count: /method.

Is this your building?