Skip to content
ViolationScout49 certifications filed against 20 new Class C in the last 180 days.Is this your building?
Buildings140 Carver Loop, BronxCurrent through

140 Carver Loop, Bronx

BBL 2-05141-0120

En español: 104 violaciones de Clase C abiertas (peligro inmediato) y 568 abiertas en total. La más antigua del HPD lleva 52 años abierta, desde el 13 de febrero de 1974.

Certifications are being filed faster than new violations come in. 49 certifications filed against 20 new Class C in the last 180 days.

The oldest open HPD violation has been open 52 years, since February 13, 1974.

Since September 29, 2023, certifications were filed on 27 Class C violations, all 27 by the original certify-by date. HPD now marks 2 of them Invalid Certification. How certification works

Is this your building?

104 open Class C and an OATH hearing on November 6, 2026. The oldest open HPD violation was filed February 13, 1974.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

OATH hearings
A hearing on a DOB summons is set for November 6, 2026.
DOB violations
60 active DOB violations. The newest was issued March 2, 2026.
Housing court
2 open housing court cases, most of them tenant actions. The newest opened December 9, 2025.
DOB complaints
25 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 24, 2026.
DOB facade
Rated Safe in the latest facade report, filed February 20, 2024 (inspection cycle 9).
DOB permits
1 DOB work permit in effect, for General Construction work, issued November 21, 2025.
Local Law 97
Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026).
Bedbug report
Filed for its 44 buildings by December 31, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened January 12, 2025, awarded for $2,210.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C104 open most often Vermin / Infestation
Vermin / InfestationOpen19252112
Vermin / InfestationOpen19252111
Notice sent19231820
Fire SafetyNotice sent19234879
Vermin / InfestationNotice sent to tenant19234857
Notice sent19223838
Notice sent19223837
Vermin / InfestationNotice sent to tenant19223638
Vermin / InfestationNotice sent to tenant19219811
Vermin / InfestationNotice sent to tenant19219792
The report lists all 104, each with the city's own words and the date on its notice. What the report adds
Class B461 open most often Mold
Notice sent19231824
MoldNotice sent to tenant19231823
Notice sent19231822
Notice sent19231821
Vermin / InfestationNotice sent19231716
Notice sent19219591
Notice sent19219589
Notice sent19218464
Notice sent19218463
Notice sent19218461
The report lists all 461, each with the city's own words and the date on its notice. What the report adds
OATH/ECB3 open most often Construction
Elevators, Class 1Hearing pending39202585NRIVERBAY CORPORATION
Construction, Class 1Found in violation39151748L
Construction, Class 2Found in violation39122094Z

The full report on 140 Carver Loop, Bronx

Get the report on 140 Carver Loop, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 140 Carver Loop, Bronx have open violations?

Yes. 140 Carver Loop, Bronx had 568 open violations on September 27, 2026: 565 from HPD and 3 from OATH/ECB. 104 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 52 years, since February 13, 1974.

Is 140 Carver Loop, Bronx getting better or worse?

Certifications are being filed faster than new violations come in. 49 certifications filed against 20 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 140 Carver Loop, Bronx?

Since September 29, 2023, certifications were filed on 27 Class C violations, all 27 by the original certify-by date. HPD now marks 2 of them Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 140 Carver Loop, Bronx have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for November 6, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 140 Carver Loop, Bronx have active DOB violations?

Yes. 60 active DOB violations. The newest was issued March 2, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 140 Carver Loop, Bronx in housing court?

Yes. 2 open housing court cases, most of them tenant actions. The newest opened December 9, 2025. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 140 Carver Loop, Bronx?

Yes. 25 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 24, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 140 Carver Loop, Bronx marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened January 12, 2025, awarded for $2,210. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 140 Carver Loop, Bronx?

Rated Safe in the latest facade report, filed February 20, 2024 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 140 Carver Loop, Bronx?

Yes. 1 DOB work permit in effect, for General Construction work, issued November 21, 2025. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When did 140 Carver Loop, Bronx last file its bedbug report?

Its 44 buildings had all filed by December 31, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 140 Carver Loop, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 140 Carver Loop, Bronx built?

The city's record gives 1969 as the year 140 Carver Loop, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 33 floors.

How many apartments does 140 Carver Loop, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 10,914 residential units at 140 Carver Loop, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 140 Carver Loop, Bronx: 104 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/140-carver-loop-bronx

How we count: /method.

Is this your building?