1175 Fulton Ave
Bronx, NY 10456
1175 Fulton Avenue is a walk-up building with 43 apartments, built in 1925. It has 42 open violations, 25 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 6, 2019.
En español: 25 violaciones de Clase C abiertas (peligro inmediato) y 42 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 6 de diciembre de 2019.
Open now, most hazardous first
- 25Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 13See the 13
Class B, hazardous, filed in the last 3 years
- 4See the 4
OATH/ECB summonses still active. Most often Construction.
5.8 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 15 certifications filed against 6 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 8 Class C violations, all 8 by the original certify-by date. How certification works
The original certify-by dates on the 38 open HPD violations have all passed. The latest was November 2, 2026.
- Zoning district
- R6
- Lot area
- 9,261 sq ft
- Floor area
- 28,800 sq ft
- Last sale
- $7,213,000
- Tax lot (BBL)
- 2-02609-0046
- Neighborhood
- Claremont Village-Claremont
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 25 open most often Vermin / Infestation | |||
| Lead Paint | Defect letter sent | 19188269 | FULTON HEIGHTS ASSOCIATES LLC | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the kitchen | ||||
| Lead Paint | Defect letter sent | 19188267 | FULTON HEIGHTS ASSOCIATES LLC | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the 3rd room from east | ||||
| CIV14 mailed | 19181538 | FULTON HEIGHTS ASSOCIATES LLC | ||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19181532 | FULTON HEIGHTS ASSOCIATES LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19181531 | FULTON HEIGHTS ASSOCIATES LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Notice sent | 19041651 | |||
| § 27-2005 HMC: Immediately provide a fire guard as directed by the NYC dept. Of housing preservation & development (HPD) and/or the NYC dept. Of buildings (DOB) to protect against fire hazards observed by HPD and/or DOB. Fire hazards observed by HPD have resulted in the following additional HPD violation(S): 19041650 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to NYC administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). A fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. The violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the HPD violation(S) referenced above and/or the fire hazards resulting in related DOB violation(S) have been dismissed. | ||||
| Heat / Hot Water | Notice sent | 18662074 | ||
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | ||||
| Heat / Hot Water | Notice sent | 18662073 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18533144 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Fire Safety | Not complied with | 17741088 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch door from vestibule to 1st story at public hall | ||||
| Vermin / Infestation | Notice sent to tenant | 17593324 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Heat / Hot Water | Notice sent | 17593323 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Lead Paint | Notice sent | 17554213 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) east wall, west wall in the 1st private hallway from north | ||||
| Lead Paint | Notice sent | 17554212 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, south wall in the 2nd private hallway from north | ||||
| Lead Paint | Notice sent | 17548751 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the 1st room from east | ||||
| Lead Paint | Notice sent | 17548750 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st riser from west at north wall, north wall, west wall in the kitchen | ||||
| Lead Paint | Notice sent | 17548749 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the bathroom | ||||
| Lead Paint | Notice sent | 17548748 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the 5th room from east | ||||
| Lead Paint | Notice sent | 17548747 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the 2nd room from east | ||||
| Vermin / Infestation | Notice sent to tenant | 17544111 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 17544110 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 17198560 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 16686669 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 16672953 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 16672952 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 13 open | |||
| Notice sent | 19203509 | FULTON HEIGHTS ASSOCIATES LLC | ||
| Notice sent | 19181542 | FULTON HEIGHTS ASSOCIATES LLC | ||
| Fire Safety | CIV14 mailed | 19181540 | FULTON HEIGHTS ASSOCIATES LLC | |
| Fire Safety | CIV14 mailed | 19181539 | FULTON HEIGHTS ASSOCIATES LLC | |
| CIV14 mailed | 19181534 | FULTON HEIGHTS ASSOCIATES LLC | ||
| Notice sent | 19181528 | FULTON HEIGHTS ASSOCIATES LLC | ||
| CIV14 mailed | 19181523 | FULTON HEIGHTS ASSOCIATES LLC | ||
| Notice sent | 18644195 | |||
| Mold | No access to reinspect (first try) | 18914037 | ||
| Notice sent | 18533143 | |||
| Notice sent | 18533142 | |||
| Mold | No access to reinspect (first try) | 17562110 | ||
| No access to reinspect (first try) | 16672956 | |||
| OATH/ECB | 4 open most often Construction | |||
| Class 2 | Hearing pending | 39209359R | FULTON HEIGHTS ASSOCIATES LLC | |
| Construction, Class 1 | Decided by default | 39194033H | ||
| Construction, Class 1 | Decided by default | 39194031Y | ||
| Construction, Class 1 | Hearing pending | 35728147Y | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 28 on September 24, 2026 and 25 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 300 violations and closed 307, all classes.
Year Filed Closed 2026 37 11 2025 17 38 2024 54 30 2023 20 52 2022 114 67 2021 8 7 2020 4 27 2019 26 5 2018 8 2 2017 12 68 - Energy benchmarking
- ENERGY STAR score 28 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed March 20, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on December 14, 2026.
- OATH/ECB summonses
- 4 DOB summonses here since January 1, 2019, with $63,750 in penalties imposed. All 4 are still active, the same 4 listed under OATH/ECB. 2 judgments docketed, the latest on November 10, 2026. A docketed judgment shows up in a title search.
- October 26, 2026, DOB: Failure to post and distribute notice to occupants of TPP. $1,250 penalty imposed.
- June 26, 2026, DOB: Failure to maintain building in code-compliant manner. Decided by default, $25,000 penalty imposed.
- June 26, 2026, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Decided by default, $12,500 penalty imposed.
The newest 3 of 4 summonses OATH lists here.
- Housing court
- 1 open housing court case, opened September 8, 2026. 8 housing court cases here since 2006. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 4 active DOB violations, most of them for construction. The newest was issued June 29, 2026.
- DOB complaints
- 12 DOB complaints in the last 12 months, 1 of them a conversion complaint. The newest was filed November 21, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 14 DOB complaints from 2008 through November 25, 2026. 14 DOB violations since 1993, 10 dismissed in DOB's records.
- DOB permits
- 3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued November 24, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Sidewalk Shed, issued November 24, 2026, in effect until February 22, 2027.
- General Construction, issued September 25, 2026, in effect until May 29, 2027.
- General Construction, issued August 6, 2026, signed off.
The newest 3 of 4 permits DOB NOW lists here.
- Boiler inspection
- Inspected February 12, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 17 other open violations this page lists without it.
- What each of the 8 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 4 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 4 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.