114 West 143rd St, Manhattan
- Built 1920
- 6 floors
- 91 residential units
- Elevator apartment building
En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 23 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 5 de enero de 2015.
Certifications are being filed faster than new violations come in. 25 certifications filed against 8 new Class C in the last 180 days.
The oldest open HPD violation has been open 11 years, since January 5, 2015.
Since September 29, 2023, certifications were filed on 12 Class C violations, all 12 by the original certify-by date. How certification works
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since May 1, 2013. Reason on the order: fire damage.
- OATH hearings
- A hearing on a DOB summons is set for November 5, 2026.
- DOB complaints
- 3 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 4, 2026.
- DOB permits
- 2 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued August 4, 2026.
- Local Law 97
- On the covered list (DOB's list, March 1, 2026).
- Bedbug report
- Filed for its 2 buildings by June 5, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since September 29, 2023, awarded for $3,435 in total. The most recent of the 3, a general construction order, was opened March 5, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 16 open most often Lead Paint | |||
| Heat / Hot Water | Notice sent | 19134520 | MALCOLM II PHASE A ASSOCIATES | |
| Fire Safety | Notice sent | 19134376 | MALCOLM II PHASE A ASSOCIATES | |
| Vermin / Infestation | Notice sent to tenant | 19134368 | MALCOLM II PHASE A ASSOCIATES | |
| Vermin / Infestation | To be reinspected | 19132275 | MALCOLM II PHASE A ASSOCIATES | |
| Vermin / Infestation | To be reinspected | 19132260 | MALCOLM II PHASE A ASSOCIATES | |
| Fire Safety | Not complied with | 18888699 | MALCOLM II PHASE A ASSOCIATES | |
| Vermin / Infestation | Not complied with | 18874289 | MALCOLM II PHASE A ASSOCIATES | |
| Vermin / Infestation | Defect letter sent | 18789018 | MALCOLM II PHASE A ASSOCIATES | |
| Mold | Defect letter sent | 18696369 | MALCOLM II PHASE A ASSOCIATES | |
| Lead Paint | No access to reinspect (first try) | 17619375 | ||
| The report lists all 16, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 5 open | |||
| No access to reinspect (first try) | 19013684 | MALCOLM II PHASE A ASSOCIATES | ||
| No access to reinspect (first try) | 19013683 | MALCOLM II PHASE A ASSOCIATES | ||
| No access to reinspect (first try) | 19013682 | MALCOLM II PHASE A ASSOCIATES | ||
| Not complied with | 17757247 | |||
| Mold | Defect letter sent | 17757244 | ||
| OATH/ECB | 2 open | |||
| Elevators, Class 2 | Hearing pending | 39202286N | MALCOLM II PHASE A ASSOCIATES | |
| Boilers, Class 2 | Admitted | 39188625K | MALCOLM II PHASE A ASSOCIATES | |
The full report on 114 West 143rd St, Manhattan
- All 23 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 2 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 114 West 143rd St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.