75 West 190th St, Bronx
- Built 1928
- 6 floors
- 48 residential units
- Elevator apartment building
En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 40 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 10 de enero de 2023.
Certifications are being filed about as fast as new violations come in. 6 certifications filed and 5 new Class C in the last 180 days, neither far ahead.
The oldest open HPD violation has been open 3 years, since January 10, 2023.
Since September 29, 2023, certifications were filed on 13 Class C violations: 9 by the original certify-by date, 4 after it. How certification works
- OATH hearings
- A hearing on a DOB summons is set for October 30, 2026.
- DOB violations
- 7 active DOB violations, most of them for low-pressure boilers. The newest was issued August 13, 2026.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed August 14, 2026.
- DOB permits
- 1 DOB work permit in effect, for Sidewalk Shed work, issued August 20, 2026.
- Certificate of occupancy
- Final, issued May 19, 2016.
- Energy benchmarking
- ENERGY STAR score 87 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since September 29, 2023, awarded for $4,145 in total. The most recent of the 3, a general construction order, was opened January 26, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 16 open most often Vermin / Infestation | |||
| Fire Safety | Notice sent | 19242036 | THE WHOLE TRUTH LLC D | |
| Notice sent | 19242028 | THE WHOLE TRUTH LLC D | ||
| Lead Paint | Notice sent | 19207967 | THE WHOLE TRUTH LLC D | |
| Fire Safety | To be reinspected | 19187858 | THE WHOLE TRUTH LLC D | |
| Certified on time | 19187402 | THE WHOLE TRUTH LLC D | ||
| Vermin / Infestation | Notice sent to tenant | 18618987 | ||
| Vermin / Infestation | Notice sent to tenant | 18618986 | ||
| Vermin / Infestation | Certified late | 17920488 | ||
| Vermin / Infestation | Certified late | 17920487 | ||
| Vermin / Infestation | Notice sent to tenant | 17709485 | ||
| The report lists all 16, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 21 open most often Fire Safety | |||
| Notice sent | 19242043 | THE WHOLE TRUTH LLC D | ||
| Fire Safety | Notice sent | 19242035 | THE WHOLE TRUTH LLC D | |
| Fire Safety | Notice sent | 19242034 | THE WHOLE TRUTH LLC D | |
| Certified on time | 19187862 | THE WHOLE TRUTH LLC D | ||
| Certified on time | 19187406 | THE WHOLE TRUTH LLC D | ||
| Notice sent | 18618991 | |||
| Notice sent | 18618990 | |||
| Notice sent | 18618989 | |||
| Notice sent | 18618988 | |||
| Notice sent | 18618985 | |||
| The report lists all 21, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 35730906Z | THE WHOLE TRUTH LLC D | |
| Construction, Class 1 | Admitted | 35690007L | ||
| Boilers, Class 2 | Admitted | 37032137H | ||
The full report on 75 West 190th St, Bronx
- All 40 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 3 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 75 West 190th St, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.