680 8th Ave, Manhattan
- Built 1920
- 15 floors
- 652 residential units
- Elevator apartment building
En español: 18 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 14 de julio de 2019.
Certifications are being filed about as fast as new violations come in. 6 certifications filed and 4 new Class C in the last 180 days, neither far ahead.
The oldest open HPD violation has been open 7 years, since July 14, 2019.
Since September 29, 2023, certifications were filed on 37 Class C violations: 30 by the original certify-by date, 7 after it. How certification works
- DOB violations
- 2 active DOB violations. The newest was issued December 1, 2023.
- Housing court
- 1 open housing court case, opened October 23, 2025.
- DOB complaints
- 15 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 26, 2026.
- DOB facade
- Rated Safe in the latest facade report, filed September 6, 2022 (inspection cycle 9).
- Certificate of occupancy
- Temporary, issued November 22, 2019.
- Energy benchmarking
- ENERGY STAR score 40 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on August 6. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since September 29, 2023, awarded for $821 in total. The most recent of the 2, a general construction order, was opened March 16, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 18 open most often Vermin / Infestation | |||
| Fire Safety | Certified late | 19031147 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Notice sent to tenant | 19021500 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Notice sent to tenant | 19005409 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Notice sent to tenant | 19005408 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Defect letter sent | 18618087 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Defect letter sent | 18618034 | BREAKING GROUND HDFC | |
| Vermin / Infestation | Defect letter sent | 18097603 | ||
| Vermin / Infestation | Defect letter sent | 18024579 | ||
| Vermin / Infestation | Not complied with | 17831687 | ||
| Vermin / Infestation | Not complied with | 17831686 | ||
| The report lists all 18, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 8 open most often Mold | |||
| Fire Safety | Notice sent | 19021928 | BREAKING GROUND HDFC | |
| Fire Safety | Notice sent | 19021927 | BREAKING GROUND HDFC | |
| No access to reinspect (first try) | 18980927 | BREAKING GROUND HDFC | ||
| Mold | Notice sent to tenant | 18989351 | BREAKING GROUND HDFC | |
| Notice sent | 18618059 | BREAKING GROUND HDFC | ||
| Mold | Defect letter sent | 17693348 | ||
| No access to reinspect (first try) | 17168853 | |||
| Mold | Defect letter sent | 16826300 | ||
The full report on 680 8th Ave, Manhattan
- All 26 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- How it compares with other Manhattan buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 680 8th Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.