Skip to content
ViolationScout10 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings649 Riverdale Avenue, BrooklynCurrent through

649 Riverdale Ave, Brooklyn

BBL 3-03825-0001

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 21 abiertas en total. La más antigua del HPD lleva 16 años abierta, desde el 28 de octubre de 2009.

Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 16 years, since October 28, 2009.

Since September 29, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works

Is this your building?

10 open Class C. The oldest open HPD violation was filed October 28, 2009.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

Boiler inspection
Inspected February 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant19029463SHEFFIELD CLUSTER DEV LP
Notice sent18424520SHEFFIELD CLUSTER DEV LP
Notice sent18424513SHEFFIELD CLUSTER DEV LP
Vermin / InfestationNo access to reinspect (first try)18197332
Vermin / InfestationDefect letter sent18102468
Vermin / InfestationDefect letter sent18102467
Vermin / InfestationDefect letter sent17600892
Vermin / InfestationDefect letter sent17282378
Vermin / InfestationDefect letter sent17282373
Vermin / InfestationDefect letter sent16640138
Class B11 open
Notice sent18782712SHEFFIELD CLUSTER DEV LP
Notice sent18539948SHEFFIELD CLUSTER DEV LP
Notice sent18539945SHEFFIELD CLUSTER DEV LP
Notice sent18539944SHEFFIELD CLUSTER DEV LP
Notice sent18539943SHEFFIELD CLUSTER DEV LP
Notice sent18539942SHEFFIELD CLUSTER DEV LP
Not complied with17282376
Not complied with16987733
Not complied with16987732
Not complied with16947929
The report lists all 11, each with the city's own words and the date on its notice. What the report adds

The full report on 649 Riverdale Ave, Brooklyn

Get the report on 649 Riverdale Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 649 Riverdale Avenue, Brooklyn have open violations?

Yes. 649 Riverdale Avenue, Brooklyn had 21 open violations on September 27, 2026: 21 from HPD. 10 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 16 years, since October 28, 2009.

Is 649 Riverdale Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 649 Riverdale Avenue, Brooklyn?

Since September 29, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

When was the boiler at 649 Riverdale Avenue, Brooklyn last inspected?

On February 13, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

Is 649 Riverdale Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 649 Riverdale Avenue, Brooklyn built?

The city's record gives 1930 as the year 649 Riverdale Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 4 floors.

How many apartments does 649 Riverdale Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 8 residential units at 649 Riverdale Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 649 Riverdale Ave, Brooklyn: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/649-riverdale-avenue-brooklyn

How we count: /method.

Is this your building?