Skip to content
ViolationScout11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings566 Greene Avenue, BrooklynCurrent through

566 Greene Ave, Brooklyn

BBL 3-01799-0009

En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total. La más antigua del HPD lleva 10 años abierta, desde el 17 de agosto de 2016.

Open violations are sitting, with little movement either way. 11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 10 years, since August 17, 2016.

Since September 29, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. HPD now marks 2 of them False Certification and 1 Invalid Certification. How certification works

Is this your building?

11 open Class C. The oldest open HPD violation was filed August 17, 2016.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
5 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued August 10, 2016.
Boiler inspection
Inspected April 22, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened May 14, 2026, awarded for $289.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C11 open
Heat / Hot WaterCIV14 mailed19146545LARRY LLC
CIV14 mailed19146544LARRY LLC
Notice sent19146543LARRY LLC
Vermin / InfestationNotice sent to tenant19146540LARRY LLC
Heat / Hot WaterInvalid certification17678520
Notice sent17678517
Notice sent17077153
Notice sent17074100
Notice sent17074098
Vermin / InfestationFalse certification16624827
The report lists all 11, each with the city's own words and the date on its notice. What the report adds
Class B9 open most often Mold
Notice sent19146542LARRY LLC
CIV14 mailed19146541LARRY LLC
MoldNo access to reinspect (first try)17384012
MoldNo access to reinspect (first try)17384011
Notice sent17077154
Notice sent17077150
Notice sent17077149
Notice sent17074101
Notice sent17074099

The full report on 566 Greene Ave, Brooklyn

Get the report on 566 Greene Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 566 Greene Avenue, Brooklyn have open violations?

Yes. 566 Greene Avenue, Brooklyn had 20 open violations on September 27, 2026: 20 from HPD. 11 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 10 years, since August 17, 2016.

Is 566 Greene Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 566 Greene Avenue, Brooklyn?

Since September 29, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. HPD now marks 2 of them False Certification and 1 Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 566 Greene Avenue, Brooklyn have active DOB violations?

Yes. 5 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued August 10, 2016. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Are any HPD emergency repair orders at 566 Greene Avenue, Brooklyn marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened May 14, 2026, awarded for $289. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was the boiler at 566 Greene Avenue, Brooklyn last inspected?

On April 22, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 566 Greene Avenue, Brooklyn last file its bedbug report?

On December 5, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 566 Greene Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 566 Greene Avenue, Brooklyn built?

The city's record gives 1931 as the year 566 Greene Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 4 floors.

How many apartments does 566 Greene Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 12 residential units at 566 Greene Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 566 Greene Ave, Brooklyn: 11 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/566-greene-avenue-brooklyn

How we count: /method.

Is this your building?