Skip to content
ViolationScout3 open Class C, with nothing filed or new in the last 180 days.Is this your building?
Buildings47-46 44 Street, QueensCurrent through

47-46 44th St, Queens

BBL 4-00173-0042

En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 4 abiertas en total. La más antigua del HPD lleva 15 años abierta, desde el 21 de diciembre de 2010.

Open violations are sitting, with little movement either way. 3 open Class C, with nothing filed or new in the last 180 days.

The oldest open HPD violation has been open 15 years, since December 21, 2010.

Since September 29, 2023, certifications were filed on 7 Class C violations: 5 by the original certify-by date, 2 after it. HPD now marks 1 of them False Certification. How certification works

Is this your building?

3 open Class C. The oldest open HPD violation was filed December 21, 2010.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
2 active DOB violations. The newest was issued June 20, 2023.
Boiler inspection
Inspected March 30, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed July 30, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C3 open
Fire SafetyFalse certification17532014
Heat / Hot WaterCertified late17532010
Certified late17532009
Class B1 open
Not complied with17715999

The full report on 47-46 44th St, Queens

Get the report on 47-46 44th St, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 47-46 44 Street, Queens have open violations?

Yes. 47-46 44 Street, Queens had 4 open violations on September 27, 2026: 4 from HPD. 3 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 15 years, since December 21, 2010.

Is 47-46 44 Street, Queens getting better or worse?

Open violations are sitting, with little movement either way. 3 open Class C, with nothing filed or new in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 47-46 44 Street, Queens?

Since September 29, 2023, certifications were filed on 7 Class C violations: 5 by the original certify-by date, 2 after it. HPD now marks 1 of them False Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 47-46 44 Street, Queens have active DOB violations?

Yes. 2 active DOB violations. The newest was issued June 20, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

When was the boiler at 47-46 44 Street, Queens last inspected?

On March 30, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 47-46 44 Street, Queens last file its bedbug report?

On July 30, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 47-46 44 Street, Queens rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 47-46 44 Street, Queens built?

The city's record gives 1928 as the year 47-46 44 Street, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 3 floors.

How many apartments does 47-46 44 Street, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 6 residential units at 47-46 44 Street, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 47-46 44th St, Queens: 3 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/47-46-44-street-queens

How we count: /method.

Is this your building?