Skip to content
ViolationScout44 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings255 Eastern Parkway, BrooklynCurrent through

255 Eastern Pkwy

Crown Heights, Brooklyn, NY 11238

255 Eastern Parkway is a condominium with 90 apartments, built in 1924. It has 107 open violations, 44 of them Class C, immediately hazardous. The oldest open HPD violation was filed on January 7, 1997.

En español: 44 violaciones de Clase C abiertas (peligro inmediato) y 107 abiertas en total. La más antigua del HPD lleva 29 años abierta, desde el 7 de enero de 1997.

Open now, most hazardous first

  1. 44

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    123 open counting every year, the oldest since

    Get these certified
  2. 61

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 61
  3. 2

    OATH/ECB summonses still active. Most often Construction.

    See the 2

4.9 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

The original certify-by dates on the 105 open HPD violations have all passed. The latest was March 24, 2026.

Zoning district
R7A
Lot area
33,600 sq ft
Floor area
107,248 sq ft
Tax lot (BBL)
3-01181-7501

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C44 open most often Lead Paint
Notice sent18281933
§ 27-2005 HMC: Properly repair or replace the broken or defective glass pane at door in the 3rd room from north
Notice sent18281932
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective ceramic wall tiles at all walls in the bathroom
Notice sent18281928
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at west
Notice sent18281923
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer
Notice sent18281921
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective hardwood floors in the private hallway
Notice sent18243691
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 8, wg to replace = 0, wg to repair = 0 in the entire apartment
Notice sent18243688
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 5th room from north at west
Notice sent18243681
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the 4th bathroom from north at center
Notice sent18243680
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color cracked plaster at, west, east walls and ceiling in the 4th bathroom from north at center
Lead PaintNotice sent18043524
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from north at east wall door in the foyer
Lead PaintNotice sent18043523
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at east wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st closet from north at east wall door frame, 1st closet from south at west wall door, 1st closet from south at west wall door frame, north wall, east wall, west wall in the foyer
Lead PaintNotice sent18043522
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from east at south wall, 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 1st bathroom from north
Lead PaintNotice sent18043521
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from north at east wall in the 4th room from north at west
Lead PaintNotice sent18043520
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door frame from north at east wall, 1st riser from south at west wall, west wall, 1st window frame from west at north wall in the 4th room from north at west
Lead PaintNotice sent18043519
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the 5th room from north at center
Lead PaintNotice sent18043518
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 2nd door from west at north wall, north wall in the private hallway
Lead PaintNotice sent18043516
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from west at north wall in the 4th room from north at east
Lead PaintNotice sent18043515
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, east wall in the 4th room from north at east
Lead PaintNotice sent18043514
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from north at east
Lead PaintNotice sent18043513
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st base cabinet from south at west wall, 1st door from east at south wall, 1st door from north at east wall, 1st door frame from north at east wall, south wall, 1st window frame from south at west wall in the kitchen
Lead PaintNotice sent18043512
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door from west at north wall, 1st door frame from west at north wall, 1st riser from north at east wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 5th room from north at west
Lead PaintNotice sent18043511
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st riser from north at east wall, south wall, east wall, west wall, 1st window frame from west at north wall in the 4th bathroom from north at center
Lead PaintNotice sent18043509
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st closet from west at north wall door frame, east wall, 1st window frame from south at west wall in the 2nd room from north
Notice sent18014791
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of 1st window from east at south lower sash which leads to fire escape is sealed shut in the 5th room from north at east
Notice sent18014790
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 9, wg to replace = 0, wg to repair = 1 in the entire apartment
Notice sent18014759
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at 2nd window frame from east at south wall in the 5th room from north at east
Notice sent18014755
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen
Notice sent18014752
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak the ceiling in the 5th room from north at west
Notice sent18014751
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at west
Notice sent18014748
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak fire retardant materials plaster ceiling in the 4th bathroom from north at center
Notice sent18014747
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak 583 ceiling in the 4th bathroom from north at center
Lead PaintNotice sent17625665
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door, 1st door from east at south wall, 1st door frame from east at south wall in the 1st room from east at north
Lead PaintNotice sent17625664
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall in the bathroom
Lead PaintNotice sent17625663
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame in the 2nd private hallway
Lead PaintNotice sent17625662
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 2nd closet from west at north wall door, 2nd closet from west at north wall door frame, south wall in the 1st private hallway
Lead PaintNotice sent17428253
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door in the foyer
Lead PaintNotice sent17428252
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door frame, 1st closet from west at north wall baseboard in the foyer
Lead PaintNotice sent17428251
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the bathroom
Lead PaintNotice sent17428250
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom
Lead PaintNotice sent17428249
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st closet from west at north wall baseboard in the 1st private hallway
Lead PaintNotice sent17428248
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from north at east wall baseboard in the 2nd private hallway
Lead PaintNotice sent17428247
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame in the 2nd private hallway
Lead PaintNotice sent17428246
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door, 1st closet from east at south wall baseboard, 1st door from east at south wall, 1st door frame from east at south wall in the 1st room from east at north
MoldNotice sent to tenant17418307
§ 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... (greater than 30 sq ft) on all walls and ceiling in the bathroom
In HPD's words. Apartment numbers are left out.
Class B61 open most often Mold
Notice sent18613929
Notice sent18281931
Notice sent18281930
Notice sent18281929
Notice sent18281927
Notice sent18281926
Notice sent18281925
Notice sent18281924
Notice sent18281922
Notice sent18281920
Notice sent18281919
Notice sent18281917
Notice sent18281916
MoldNo access to reinspect (first try)18591110
Notice sent18246123
Notice sent18246121
Notice sent18243698
Notice sent18243697
Notice sent18243696
Notice sent18243695
Notice sent18243694
Fire SafetyNotice sent18243693
Fire SafetyNotice sent18243692
Notice sent18243690
Notice sent18243689
Notice sent18243687
Notice sent18243686
Notice sent18243678
MoldNo access to reinspect (first try)18243677
Notice sent18243676
Notice sent18243675
Notice sent18243674
Notice sent18243673
MoldNo access to reinspect (first try)18306785
MoldNo access to reinspect (first try)18306784
MoldNo access to reinspect (first try)18306783
MoldNo access to reinspect (first try)18306782
MoldNo access to reinspect (first try)18306781
Notice sent18036229
Notice sent18014808
Notice sent18014806
Notice sent18014805
Notice sent18014803
Notice sent18014800
Notice sent18014799
Notice sent18014798
Notice sent18014797
Notice sent18014796
Notice sent18014793
Notice sent18014792
Fire SafetyNotice sent18014789
Fire SafetyNotice sent18014788
Notice sent18014787
Notice sent18014786
Notice sent18014784
Notice sent18014765
Notice sent18014745
Notice sent17616848
Notice sent17616846
Notice sent17418315
Notice sent17418313
OATH/ECB2 open most often Construction
Construction, Class 2Decided by default39190371M
Construction, Class 1Hearing pending35718838Y
Is this your building?Also for tenants and buyers
Is this your building?

An OATH hearing on May 7, 2027.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
44 on September 24, 2026 and 44 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 333 violations and closed 84, all classes.
YearFiledClosed
202634
202515819
2024152
20231810
2022824
2021870
2020140
2019171
201872
2017622
Energy benchmarking
ENERGY STAR score 78 for 2025, against a median of 69 for Multifamily Housing that year.
Local Law 97
Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.

Hearings and penalties

OATH hearings
A hearing on a DOB summons is set for May 7, 2027.
OATH/ECB summonses
15 DOB and FDNY summonses here since January 1, 2019, with $18,155 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB.
  • May 29, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $6,250 penalty imposed.
  • February 9, 2026, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Adjourned, $6,250 penalty imposed.
  • April 28, 2023, FDNY: Fire-rated construction. In violation.

The newest 3 of 15 summonses OATH lists here.

How a default is vacated

Housing court
17 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
4 active DOB violations, most of them for construction. The newest was issued April 9, 2025.
DOB, all years
32 DOB violations since 1988, 20 resolved and 8 dismissed in DOB's records.
DOB permits
2 DOB work permits in effect. The latest, for Plumbing work, was issued September 29, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Plumbing, issued September 29, 2026, in effect until December 1, 2026.
  • General Construction, issued September 4, 2026, in effect until July 1, 2027.
  • General Construction, issued April 7, 2026, expired October 31, 2026.

The newest 3 of 31 permits DOB NOW lists here.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 255 Eastern Pkwy have open violations?

Yes. It had 107 open violations on November 25, 2026: 2 from OATH/ECB and 105 from HPD. 44 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 29 years, since January 7, 1997.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 44 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, Local Law 84 energy reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 255 Eastern Pkwy, Brooklyn: 90 units, 44 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/255-eastern-parkway-brooklyn

How we count: /method.

Is this your building?