2075 Walton Ave, Bronx
- Built 1927
- 6 floors
- 54 residential units
- Elevator apartment building
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 31 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 11 de septiembre de 2024.
Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
The oldest open HPD violation has been open 2 years, since September 11, 2024.
Since September 29, 2023, certifications were filed on 7 Class C violations: 5 by the original certify-by date, 2 after it. HPD now marks 1 of them Invalid Certification. How certification works
- DOB violations
- 6 active DOB violations, most of them for low-pressure boilers. The newest was issued June 20, 2023.
- DOB facade
- Rated SWARMP in the latest facade report, filed July 10, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 3 boilers, inspected between March 18, 2025 and February 24, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 29, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since September 29, 2023, awarded for $590 in total. The most recent of the 2, a general construction order, was opened March 9, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Heat / Hot Water | |||
| Fire Safety | Notice sent | 19031710 | WALTON HEIGHTS HDFC | |
| Notice sent | 18735631 | WALTON HEIGHTS HDFC | ||
| Fire Safety | Notice sent | 18735630 | WALTON HEIGHTS HDFC | |
| Notice sent | 18667860 | WALTON HEIGHTS HDFC | ||
| Heat / Hot Water | Notice sent | 18667859 | WALTON HEIGHTS HDFC | |
| Fire Safety | Notice sent | 18667858 | WALTON HEIGHTS HDFC | |
| Heat / Hot Water | Invalid certification | 18545863 | WALTON HEIGHTS HDFC | |
| Heat / Hot Water | Notice sent | 18520296 | WALTON HEIGHTS HDFC | |
| Heat / Hot Water | Notice sent | 18520292 | WALTON HEIGHTS HDFC | |
| Heat / Hot Water | Notice sent | 18499644 | WALTON HEIGHTS HDFC | |
| Class B | 21 open most often Mold | |||
| Notice sent | 19031703 | WALTON HEIGHTS HDFC | ||
| Notice sent | 19031678 | WALTON HEIGHTS HDFC | ||
| Mold | Notice sent to tenant | 19132089 | WALTON HEIGHTS HDFC | |
| Notice sent | 18768415 | WALTON HEIGHTS HDFC | ||
| Mold | Defect letter sent | 18768414 | WALTON HEIGHTS HDFC | |
| Notice sent | 18735629 | WALTON HEIGHTS HDFC | ||
| Mold | Defect letter sent | 18735628 | WALTON HEIGHTS HDFC | |
| Mold | Notice sent to tenant | 19055371 | WALTON HEIGHTS HDFC | |
| Notice sent | 18667861 | WALTON HEIGHTS HDFC | ||
| Mold | Defect letter sent | 18807581 | WALTON HEIGHTS HDFC | |
| The report lists all 21, each with the city's own words and the date on its notice. What the report adds | ||||
The full report on 2075 Walton Ave, Bronx
- All 31 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 2075 Walton Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.