Skip to content
ViolationScout6 open Class C, with 1 certification filed and 3 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings141-18 Cherry Avenue, QueensCurrent through

141-18 Cherry Ave, Queens

BBL 4-05193-7506

En español: 6 violaciones de Clase C abiertas (peligro inmediato) y 12 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 14 de junio de 2021.

Open violations are sitting, with little movement either way. 6 open Class C, with 1 certification filed and 3 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 5 years, since June 14, 2021.

Since September 29, 2023, certifications were filed on 4 Class C violations: 2 by the original certify-by date, 2 after it. How certification works

Is this your building?

6 open Class C. The oldest open HPD violation was filed June 14, 2021.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
5 active DOB violations, most of them for not benchmarking energy use. The newest was issued June 23, 2024.
Certificate of occupancy
Final, issued December 2, 2013.
Local Law 97
Covered since 2024 (DOB's list, March 1, 2026).
Bedbug report
Filed August 3, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened April 8, 2026, awarded for $528.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C6 open most often Fire Safety
Fire SafetyNotice sent19166915Cherry Manor Condominium
Fire SafetyNotice sent19166888Cherry Manor Condominium
Fire SafetyNot complied with18985302Cherry Manor Condominium
Vermin / InfestationNo access to reinspect (first try)18498946Cherry Manor Condominium
Vermin / InfestationNo access to reinspect (first try)18498945Cherry Manor Condominium
No access to reinspect (first try)18498943Cherry Manor Condominium
Class B6 open most often Fire Safety
Fire SafetyNotice sent18596838Cherry Manor Condominium
Notice sent18498952Cherry Manor Condominium
Fire SafetyNotice sent18498950Cherry Manor Condominium
No access to reinspect (first try)18498949Cherry Manor Condominium
MoldNo access to reinspect (first try)18498948Cherry Manor Condominium
No access to reinspect (first try)18498947Cherry Manor Condominium

The full report on 141-18 Cherry Ave, Queens

Get the report on 141-18 Cherry Ave, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 141-18 Cherry Avenue, Queens have open violations?

Yes. 141-18 Cherry Avenue, Queens had 12 open violations on September 27, 2026: 12 from HPD. 6 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 5 years, since June 14, 2021.

Is 141-18 Cherry Avenue, Queens getting better or worse?

Open violations are sitting, with little movement either way. 6 open Class C, with 1 certification filed and 3 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 141-18 Cherry Avenue, Queens?

Since September 29, 2023, certifications were filed on 4 Class C violations: 2 by the original certify-by date, 2 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 141-18 Cherry Avenue, Queens have active DOB violations?

Yes. 5 active DOB violations, most of them for not benchmarking energy use. The newest was issued June 23, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Are any HPD emergency repair orders at 141-18 Cherry Avenue, Queens marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened April 8, 2026, awarded for $528. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Does 141-18 Cherry Avenue, Queens have a certificate of occupancy?

Its latest certificate of occupancy is a final one, issued December 2, 2013. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

When did 141-18 Cherry Avenue, Queens last file its bedbug report?

On August 3, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 141-18 Cherry Avenue, Queens covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered since 2024 (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 141-18 Cherry Avenue, Queens built?

The city's record gives 2011 as the year 141-18 Cherry Avenue, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a condominium with 6 floors.

How many apartments does 141-18 Cherry Avenue, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 46 residential units at 141-18 Cherry Avenue, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB certificates of occupancy, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB certificates of occupancy, HPD emergency repair orders, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 141-18 Cherry Ave, Queens: 6 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/141-18-cherry-avenue-queens

How we count: /method.

Is this your building?