Skip to content
ViolationScout19 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings1346 Park Place, BrooklynCurrent through

1346 Park Pl, Brooklyn

BBL 3-01372-0017

En español: 19 violaciones de Clase C abiertas (peligro inmediato) y 28 abiertas en total. La más antigua del HPD lleva 45 años abierta, desde el 6 de julio de 1981.

Open violations are sitting, with little movement either way. 19 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 45 years, since July 6, 1981.

Since September 29, 2023, certifications were filed on 3 Class C violations, all 3 after the original certify-by date. How certification works

Is this your building?

19 open Class C. The oldest open HPD violation was filed July 6, 1981.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

DOB violations
9 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
Housing court
1 open housing court case, opened April 6, 2026.
DOB complaints
1 DOB complaint in the 12 months to September 25, 2026. It was filed August 5, 2026.
Boiler inspection
Inspected September 15, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed April 6, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
HPD emergency repair order
1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened November 17, 2025, awarded for $300.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C19 open most often Lead Paint
Notice sent187977301346 PARK PLACE HDFC
Notice sent187977281346 PARK PLACE HDFC
Fire SafetyNotice sent187977271346 PARK PLACE HDFC
Lead PaintNotice sent18291310
Lead PaintNotice sent18291309
Lead PaintNotice sent18291308
Lead PaintNotice sent18291307
Lead PaintNotice sent18291306
Lead PaintNotice sent18291305
Lead PaintNotice sent18291304
The report lists all 19, each with the city's own words and the date on its notice. What the report adds
Class B9 open most often Fire Safety
Postponement denied187977311346 PARK PLACE HDFC
Postponement denied187977291346 PARK PLACE HDFC
MoldNo access to reinspect (first try)18624957
Notice sent18280795
Notice sent18280793
Notice sent18280792
Fire SafetyNotice sent18280789
Fire SafetyNotice sent18280788
Notice sent18280784

The full report on 1346 Park Pl, Brooklyn

Get the report on 1346 Park Pl, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1346 Park Place, Brooklyn have open violations?

Yes. 1346 Park Place, Brooklyn had 28 open violations on September 27, 2026: 28 from HPD. 19 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 45 years, since July 6, 1981.

Is 1346 Park Place, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 19 open Class C, with 2 certifications filed and 3 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1346 Park Place, Brooklyn?

Since September 29, 2023, certifications were filed on 3 Class C violations, all 3 after the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1346 Park Place, Brooklyn have active DOB violations?

Yes. 9 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 1346 Park Place, Brooklyn in housing court?

Yes. 1 open housing court case, opened April 6, 2026. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 1346 Park Place, Brooklyn?

Yes. 1 DOB complaint in the 12 months to September 25, 2026. It was filed August 5, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 1346 Park Place, Brooklyn marked completed?

Yes. 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened November 17, 2025, awarded for $300. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was the boiler at 1346 Park Place, Brooklyn last inspected?

On September 15, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 1346 Park Place, Brooklyn last file its bedbug report?

On April 6, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

When was 1346 Park Place, Brooklyn built?

The city's record gives 1923 as the year 1346 Park Place, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 4 floors.

How many apartments does 1346 Park Place, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 27 residential units at 1346 Park Place, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, HPD's housing court cases, DOB complaints, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, HPD's housing court cases, DOB complaints, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1346 Park Pl, Brooklyn: 19 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/1346-park-place-brooklyn

How we count: /method.

Is this your building?