8 open Class C, with 1 certification filed and 2 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings/11-15 Mcbride Street, QueensCurrent through
11-15 Mcbride St, Queens
BBL 4-15714-0107
Built 2006
3 floors
3 residential units
Three-family dwelling
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 21 de junio de 2024.
Open violations are sitting, with little movement either way. 8 open Class C, with 1 certification filed and 2 new Class C in the last 180 days, too few to call a direction.
The oldest open HPD violation has been open 2 years, since June 21, 2024.
Since September 29, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
Bedbug report
Filed December 29, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
Does 11-15 Mcbride Street, Queens have open violations?
Yes. 11-15 Mcbride Street, Queens had 22 open violations on September 27, 2026: 22 from HPD. 8 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since June 21, 2024.
Is 11-15 Mcbride Street, Queens getting better or worse?
Open violations are sitting, with little movement either way. 8 open Class C, with 1 certification filed and 2 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.
When were certifications filed on Class C violations at 11-15 Mcbride Street, Queens?
Since September 29, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.
When did 11-15 Mcbride Street, Queens last file its bedbug report?
On December 29, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.
When was 11-15 Mcbride Street, Queens built?
The city's record gives 2006 as the year 11-15 Mcbride Street, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a three-family dwelling with 3 floors.
How many apartments does 11-15 Mcbride Street, Queens have?
The Department of City Planning's PLUTO tax-lot file lists 3 residential units at 11-15 Mcbride Street, Queens. The count is for the whole tax lot.
Where do these numbers come from?
From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.
Sources. HPD housing violations and OATH/ECB hearing results, plus HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.
Cite this page
ViolationScout, 11-15 Mcbride St, Queens: 8 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/11-15-mcbride-street-queens