1027 Walton Ave, Bronx
- Built 1927
- 6 floors
- 85 residential units
- Elevator apartment building
En español: 19 violaciones de Clase C abiertas (peligro inmediato) y 54 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 30 de agosto de 2023.
Certifications are being filed faster than new violations come in. 119 certifications filed against 14 new Class C in the last 180 days.
The oldest open HPD violation has been open 3 years, since August 30, 2023.
Since September 29, 2023, certifications were filed on 72 Class C violations, all 72 by the original certify-by date. HPD now marks 7 of them False Certification. How certification works
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on October 16, 2026.
- DOB violations
- 1 active DOB violation, issued February 26, 2026.
- Housing court
- 1 open housing court case, opened June 9, 2026.
- DOB complaints
- 4 DOB complaints in the 12 months to September 25, 2026. The newest was filed May 5, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed January 31, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Bedbug report
- Filed December 30, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since September 29, 2023: a general construction order, opened October 26, 2023, awarded for $295.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 19 open most often Vermin / Infestation | |||
| Notice sent | 19230300 | 1027 WALLCO LLC | ||
| Vermin / Infestation | Notice sent to tenant | 19230288 | 1027 WALLCO LLC | |
| Fire Safety | Notice sent | 19230286 | 1027 WALLCO LLC | |
| Vermin / Infestation | Notice sent to tenant | 19230283 | 1027 WALLCO LLC | |
| Vermin / Infestation | Notice sent to tenant | 19159676 | 1027 WALLCO LLC | |
| Vermin / Infestation | CIV14 mailed | 19131219 | 1027 WALLCO LLC | |
| Vermin / Infestation | No access to reinspect (first try) | 19036914 | ||
| Vermin / Infestation | No access to reinspect (first try) | 19036913 | ||
| Vermin / Infestation | Certified on time | 19033656 | ||
| Vermin / Infestation | False certification | 18911745 | ||
| The report lists all 19, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 32 open most often Fire Safety | |||
| Notice sent | 19230299 | 1027 WALLCO LLC | ||
| Notice sent | 19230298 | 1027 WALLCO LLC | ||
| Notice sent | 19230297 | 1027 WALLCO LLC | ||
| Notice sent | 19230296 | 1027 WALLCO LLC | ||
| Notice sent | 19230295 | 1027 WALLCO LLC | ||
| Notice sent | 19230294 | 1027 WALLCO LLC | ||
| Notice sent | 19230292 | 1027 WALLCO LLC | ||
| Notice sent | 19230291 | 1027 WALLCO LLC | ||
| Notice sent | 19230290 | 1027 WALLCO LLC | ||
| Notice sent | 19230287 | 1027 WALLCO LLC | ||
| The report lists all 32, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 2 | Decided by default | 39187510X | ||
| Construction, Class 1 | Hearing pending | 39178766P | ||
| Construction, Class 1 | Hearing pending | 39178765N | ||
The full report on 1027 Walton Ave, Bronx
- All 54 open violations, each with the city's own words and the date on its notice.
- What each status means, and how many of these carry it.
- 3 OATH/ECB summonses with their hearing dates and any penalty imposed.
- How it compares with other Bronx buildings its size.
- Every other record on this page, on a cover you can forward.
Get the report on 1027 Walton Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.